Re: [Sphenix-magnet-l] Signals from the Cryo group available at the Mezzanine 1008B
- From: "Rosas, Pablo J" <rosas AT bnl.gov>
- To: "Yip, Kin" <kinyip AT bnl.gov>, "Schultheiss, Carl" <carls AT bnl.gov>
- Cc: "Danielson, Nils S" <ndanielson AT bnl.gov>, "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
- Subject: Re: [Sphenix-magnet-l] Signals from the Cryo group available at the Mezzanine 1008B
- Date: Wed, 9 Feb 2022 14:42:36 +0000
Hello Kin;
Yes , both cables.
Thanks
Pablo
From: Yip, Kin <kinyip AT bnl.gov>
Hi,
You are talking about just current signal ? (Or also the cryo permissive ?
Cryo group did all that ... We should contact Nils Danielson, L. Masi ...
Kin
-------- Original message -------- From: "Rosas, Pablo J" <rosas AT bnl.gov> Date: 2/9/22 09:37 (GMT-05:00) To: "Yip, Kin" <kinyip AT bnl.gov>, "Schultheiss, Carl" <carls AT bnl.gov> Cc: sphenix-magnet-l AT lists.bnl.gov, "Karl, Robert F" <rkarl AT bnl.gov>, "Chan, David" <dchan AT bnl.gov> Subject: RE: Signals from the Cryo group available at the Mezzanine 1008B
Good morning Kin;
I took a looked at the cable’s, I would prefer not to splice them to extend them. If you can show me where they are coming from I will run new cables to the PS and the DCCT Half Rack.
Thanks
Pablo
From: Yip, Kin <kinyip AT bnl.gov>
Hi,
Thanks Karl for making those copper bars which will be used to connect the Current Leaks with the 2*12 535-MCM cables.
In the picture which I took this morning, it shows that Lenny Masi holding 3 cables. The thickest one is for those TT01…5 thermal sensors (strain gauge) and linear-pot, the 2nd thickest one is one with 8 conductors for 2 cryo-signals (Cryo-permissive …) and the thinnest one is for the magnetic current. These cables are only long enough for Carl’s DAQ rack. To connect them to the PLC of the Magnet or even the DCCT rack (also on the mezzanine), you have to “extend” them yourselves.
Kin
From: Karl, Robert F <rkarl AT bnl.gov>
Hi Kin,
The Buss Bars were purchased and fabricated to your specifications.
Thanks, Rob
From: Yip, Kin <kinyip AT bnl.gov>
Hi Rob, Have you purchased and even fabricated the copper bars for dealing with 12*2 (=24) 535 MCM (locomotive) cables ? And, have you also found or purchased 535 MCM cables (24) to connect them from the West Wall of 1008-IR to the Valvebox on the platform ? I just was chatting with Dennis Donaldson ... Dennis has started to think about the cable tray for these MCM cables.
And I just talked with John Haggerty (senior physicist in sPHENIX), he's re-convinced me again that though nothing is impossible, we (sPHENIX) won't move the carriage from IR to the Assembly Hall. Because for that "movement" (IR->Assembly Hall), they have to break the beampipe, take out all those detectors MVTX/IINT (spelling?) etc. etc. which are very painful to install and take out. Not to mention these MCM cables. Kin
On 12/13/21 16:49, Karl, Robert F wrote:
|
-
[Sphenix-magnet-l] Signals from the Cryo group available at the Mezzanine 1008B,
Yip, Kin, 02/07/2022
-
Re: [Sphenix-magnet-l] Signals from the Cryo group available at the Mezzanine 1008B,
Rosas, Pablo J, 02/09/2022
-
Re: [Sphenix-magnet-l] Signals from the Cryo group available at the Mezzanine 1008B,
Yip, Kin, 02/09/2022
- Re: [Sphenix-magnet-l] Signals from the Cryo group available at the Mezzanine 1008B, Rosas, Pablo J, 02/09/2022
-
Re: [Sphenix-magnet-l] Signals from the Cryo group available at the Mezzanine 1008B,
Tallerico, Thomas N, 02/09/2022
-
Message not available
- Re: [Sphenix-magnet-l] Signals from the Cryo group available at the Mezzanine 1008B, Rosas, Pablo J, 02/09/2022
-
Message not available
-
Re: [Sphenix-magnet-l] Signals from the Cryo group available at the Mezzanine 1008B,
Yip, Kin, 02/09/2022
-
Re: [Sphenix-magnet-l] Signals from the Cryo group available at the Mezzanine 1008B,
Rosas, Pablo J, 02/09/2022
Archive powered by MHonArc 2.6.24.