Skip to Content.
Sympa Menu

sphenix-maps-l - Re: [Sphenix-maps-l] MAPS-based Vertex Detector (MVTX) pre-proposal - v1.2

sphenix-maps-l AT lists.bnl.gov

Subject: sPHENIX MAPS tracker discussion

List archive

Chronological Thread  
  • From: "Huang, Jin" <jhuang AT bnl.gov>
  • To: sphenix-maps-l <sphenix-maps-l AT lists.bnl.gov>
  • Subject: Re: [Sphenix-maps-l] MAPS-based Vertex Detector (MVTX) pre-proposal - v1.2
  • Date: Thu, 2 Feb 2017 02:01:12 +0000

Hello everyone

 

Thanks for the comments and suggestion from Nu and Xin on pre-proposal Fig. 9, and the selection of theory curves has been adjusted on the b-jet R_AA projection.

 

In the last draft, the curves were evaluated for the LHC energy and included a large uncertainty at low-pT region due to the uncertainty of g->bb jets component. Ivan’s group was contacted to update the R_AA projection for our proposal. However, at this moment, we will not have their update for our pre-proposal. Therefore, at this point, we are trying to find a temporary solution for theory comparisons of the sPHENIX R_AA projection.

 

Since the RHIC inclusive b-jets are expected to be dominated by b-quark jets (90%), we only kept the b-quark jet R_AA theory curve from Ivan’s model, removed g->bb curve and its associated uncertainty bands. The text was adjusted to emphasize the difference between the curves (b-quark jets) and the projection (inclusive b-jets), mentioned that the curves are being updated for RHIC energy and correlation studies will be used to clarify the b-jet origin.

 

Further comments and suggestions will be welcomed.

 

Cheers,

 

Jin & Ming

 

 

 

______________________________

 

Jin HUANG, Ph. D.

 

Associate Physicist

Brookhaven National Laboratory

Physics Department, Bldg 510 C

Upton, NY 11973-5000

 

Office: 631-344-5898

Cell:   757-604-9946

______________________________

 

From: sphenix-maps-l-bounces AT lists.bnl.gov [mailto:sphenix-maps-l-bounces AT lists.bnl.gov] On Behalf Of Ming Liu (ming AT bnl.gov)
Sent: Wednesday, February 1, 2017 3:31 AM
To: sphenix-maps-l <sphenix-maps-l AT lists.bnl.gov>; sphenix-l AT lists.bnl.gov
Cc: phenix-team <p25henp-l AT lanl.gov>
Subject: [Sphenix-maps-l] MAPS-based Vertex Detector (MVTX) pre-proposal - v1.2

 

Dear all,

 

Thanks for you all who have made tremendous contributions to the writing of the  MVTX pre-proposal. 

Following is the snap shot as of tonight, released to the collaboration for review,

 

And also the overleaf page,

 

Updated from last version:

  1. The total cost is now $4.87M, including contingency
  2. Cost and Schedule are updated with more balanced labor rates. 
  3. All comments and suggestions received are now taken into account in the latest version.

The org chart and cost and schedule figures/tables will be updated tomorrow.

 

Please try to edit or send your comments by the end of tomorrow if possible, we try to submit the pre-proposal to DOE in next a few days (original target date: Feb 1, but we are running a bit behind the plan, I know everyone is busy with QM and other things)

 

Cheers,

Ming 

 

-- 

Ming Xiong Liu

P-25, MS H846                              TEL:                      505-667-7125 

Physics Division                                                                        631-344-7821(BNL)

LANL                                                                                          630-840-5708(FNAL)

Los Alamos, NM 87545 FAX:       505-665-7020

 

From: <owner-p25henp-l AT maillist.lanl.gov> on behalf of "Ming Liu (LANL)" <ming AT bnl.gov>
Date: Wednesday, January 25, 2017 at 10:41 PM
To: sphenix-maps-l <sphenix-maps-l AT lists.bnl.gov>
Cc: phenix-team <p25henp-l AT lanl.gov>
Subject: MAPS-based Vertex Detector (MVTX) proposal

 

Hi all,

Thanks for all who have contributed to the MIE proposal,  we have made very good progress at LBNL finishing up the draft. 

 

Now we also have a new for the full detector : MAPS-based Vertex Detector (MVTX)

 

Attached is the link to a snapshot of the proposal, v1.0, 

 

and the overleaf Latex page,  

 

 

Plan for next a few days:

 

1)   Get all inputs/edit by the end of next Monday, Jan 30th, final edit Tuesday 1/31

2)   Submit the pre-proposal to DOE a week from now, on Feb 1, 2017. (Wed)

 

There will be DOE budget meeting scheduled for national labs, 2/15(LANL), 2/16(BNL) and 2/22(LBNL). 

 

Here are names of lead people assigned at workshop to proofreading/editing the draft, by next Monday.

 

Ch.  1,2,3 -  Nu Xu

Ch. 4, 5 – Dave Morrison

Ch. 6 - Mateusz Ploskon

Ch. 7, 8 – Ming Liu, Bob Redwine 

 

Overall draft proofreading -  Grazyna, Gunther, Darren, Denis P., Jin, Tony, Dave Lee, Hubert  et al.  

 

Cheers,

Ming, for the MVTX detector group

 

-- 

Ming Xiong Liu

P-25, MS H846                              TEL:                      505-667-7125 

Physics Division                                                                        631-344-7821(BNL)

LANL                                                                                          630-840-5708(FNAL)

Los Alamos, NM 87545 FAX:       505-665-7020




Archive powered by MHonArc 2.6.24.

Top of Page