Subject: sPHENIX MAPS tracker discussion
List archive
Re: [Sphenix-maps-l] sPHENIX MVTX/INTT near term R&D etc
- From: Itaru Nakagawa <itaru AT bnl.gov>
- To: mxliu <ming AT bnl.gov>, sPHENIX LDRD <sphenix-ldrd AT lanl.gov>, sPHENIX-MVTX <sphenix-maps-l AT lists.bnl.gov>
- Cc: Rachid Nouicer <rachid.nouicer AT bnl.gov>, henp-team <p25henp-l AT lanl.gov>
- Subject: Re: [Sphenix-maps-l] sPHENIX MVTX/INTT near term R&D etc
- Date: Wed, 2 May 2018 08:53:18 +0900
Dear Ming, Thank you very much for the summary. We would like to discuss
about the integration issue within our group and provides our
feedback accordingly. Regards, -itaru
On 2018/05/02 7:43, mxliu wrote:
Hi all, I thought we had very good meetings/discussions at MIT in the last two days, thanks Gunther and Bob hosting the event at MIT.
Here are a few near term action items MVT/INTT groups will work on in preparation for the mini sPHENIX review (~last week of June or early July, TBD soon).
Summary slides, https://indico.bnl.gov/event/4380/contributions/21111/attachments/18316/22838/MVTX-RD-MIT-042018-day2.pptx
The workfest page, https://indico.bnl.gov/event/4380/overview
Cheers, Ming
---- •w/ ~50cm FPC power extension @LANL, voltage drop, noise pickup MVTX conical structure modification, reduced radius •w/ 10cm extension FPC – Plan A INTT layout, “cables” and supporting structures Final extension bus ~1.2m, INTT, summer 18 MVTX conical structure modification 10cm HS signal simulation now .. Early R&D possible? right now, ~Sept 2018 @CERN Mechanical mockup: MVTX+INTT + .. , @BNL, LANL •w/o FPC extension – Plan B
-- Ming Xiong Liu P-25, MS H846 TEL:505-667-7125 Physics Division 631-344-7821(BNL) LANL 630-840-5708(FNAL) Los Alamos, NM 87545 FAX: 505-665-7020
|
-