[Sphenix-maps-l] FW: "end-game" sPHENIX installation
- From: Ming Liu <ming AT bnl.gov>
- To: sphenix-mvtx-l <sphenix-maps-l AT lists.bnl.gov>, Walter Sondheim <sondheim AT lanl.gov>, James E Kelsey <jkelsey AT mit.edu>, Jason Bessouille <jason_b AT mit.edu>, Joseph L Dodge <jdodge AT mit.edu>
- Subject: [Sphenix-maps-l] FW: "end-game" sPHENIX installation
- Date: Tue, 08 Sep 2020 17:10:08 -0600
FYI, MVTX and other sPHENIX subsystem installation duration – subject to further discussion:
Days. Activity
Cheers, Ming
-- Ming Xiong Liu P-25, MS H846 TEL: 505-667-7125 Physics Division 631-344-7821(BNL) LANL 630-840-5708(FNAL) Los Alamos, NM 87545 FAX: 505-665-7020
From: Glenn Young <glennyoung82251 AT gmail.com>
Dear sPHENIX colleagues The part of sPHENIX installation after the magnet is mapped is going to be a subject of increasing discussion based on recent meetings with CAD people. In particular TPC, beampipe, INTT, and MVTX figure into the timeline. MBD is assumed to be done in parallel with the silicon detectors.
This ought to form a basis for further discussion. I am sure we'll have several chances to present this to various groups going forward. ;-) |
Attachment:
Durations for Post-Mapping Installation P6 Sept 7 2020.xlsx
Description: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet