sphenix-maps-l AT lists.bnl.gov
Subject: sPHENIX MAPS tracker discussion
List archive
Re: [Sphenix-maps-l] MVTX commissioning plan .... Possible rework on detector at BNL
- From: Edward O'Brien <eobrien AT bnl.gov>
- To: sphenix-maps-l AT lists.bnl.gov
- Subject: Re: [Sphenix-maps-l] MVTX commissioning plan .... Possible rework on detector at BNL
- Date: Wed, 5 May 2021 15:58:15 -0400
Hi Ming and Grazyna,
We need to look into our options for a small clean tent somewhere
in the 1008 complex. The 1008 Assembly Hall is smaller that the one in
1006. Perhaps there is other space in the 1008 complex that could be used.
How large a tent would be needed? 10' x 15'? Thanks.
Ed
On 4/27/21 9:13 PM, Ming Liu wrote:
Hi Ed and Grazyna,
Yes, it is a good idea to have a clean tent with sufficient space for the
half-detector, the overall length is <~ 2.5m, not super large.
We could bring it up at next sPHENIX planning meeting?
Cheers,
Ming
-----
Dr. Ming Xiong Liu
P-3, MS H846
Physics Division
Office: 505.667.7125
Mobile: 505.412.7396
Los Alamos National Laboratory
lanl.gov
<https://www.instagram.com/losalamosnatlab/> <https://twitter.com/LosAlamosNatLab> <https://www.linkedin.com/company/los-alamos-national-laboratory/> <https://www.facebook.com/LosAlamosNationalLab/>
- Re: [Sphenix-maps-l] MVTX commissioning plan .... Possible rework on detector at BNL, Edward O'Brien, 05/05/2021
Archive powered by MHonArc 2.6.24.