Skip to Content.
Sympa Menu

sphenix-maps-l - Re: [Sphenix-maps-l] Skip next Monday's MVTX meeting 12/12

sphenix-maps-l AT lists.bnl.gov

Subject: sPHENIX MAPS tracker discussion

List archive

Chronological Thread  
  • From: Ming Liu <ming AT bnl.gov>
  • To: Joe Dodge <jdodge AT mit.edu>, SPHENIX MVTX <sphenix-maps-l AT lists.bnl.gov>, Eric Renner <erenner AT lanl.gov>, Anton Navazo <anavazo AT lanl.gov>
  • Cc: Camelia Mironov <camelia.mironov AT cern.ch>
  • Subject: Re: [Sphenix-maps-l] Skip next Monday's MVTX meeting 12/12
  • Date: Sat, 10 Dec 2022 09:18:27 -0500

Hi Joe,

My bad. I meant we will skip the MVTX meeting next Monday 12/12.

There will be 3-day sPHENIX collaboration meeting Mon-Wed.

 

Cheers,

Ming

 

 

-----

signature_61897647

 

Dr. Ming Xiong Liu

P-3, MS H846

Physics Division

 

Office: 505.667.7125

Mobile: 505.412.7396

Los Alamos National Laboratory

 

 

From: Joseph Dodge <jdodge AT mit.edu>
Organization: MIT - Bates Researche and Engineering Center
Date: Friday, December 9, 2022 at 9:01 AM
To: "Ming Liu (BNL)" <ming AT bnl.gov>, SPHENIX MVTX <sphenix-maps-l AT lists.bnl.gov>, Eric Renner <erenner AT lanl.gov>, Anton Navazo <anavazo AT lanl.gov>
Cc: Camelia Mironov <camelia.mironov AT cern.ch>
Subject: Re: Skip next Monday's MVTX meeting 12/12

 

Ming,

Could you please clarify your first sentence? (As some of the wording is missing)

II think you meant to say the MVTX Collaboration meeting is cancelled, but we are having our MVTX group meeting - Is this correct?

Joe

On 12/9/2022 8:23 AM, Ming Liu wrote:

Dear all,

 

Due to conflict with sPHENIX collaboration meeting next week, we will the Monday’s MVTX project meeting.

However, some of us will use the time to have a small group chat of 3D scan and insertion plan.

 

A quick summary from this week at BNL 1008: many people have been working at BNL

  1. Good progress with WinCC and CAEN power system
  2. The 2nd rack cooling system connection completed, all 3 cooling systems are in operation
  3. Insertion X-wing, blue table moved to physics 510 2-82, small optical table will be moved there soon (today?)
  4. Working in progress to arrange 3D scan at BNL
  5. MVTX budget plan discussed and updated, no-cost extension in progress, MIT,LBNL, LANL

 

Cheers,

Ming

 

-----

signature_61897647

 

Dr. Ming Xiong Liu

P-3, MS H846

Physics Division

 

Office: 505.667.7125

Mobile: 505.412.7396

Los Alamos National Laboratory

 

--

 

--

 

Image removed by sender.

 

 

 

                                                        Image removed by sender.

 Joseph Dodge

Mechanical Designer / Electrical Lead

MIT - Bates Research and Engineering Center

21 Manning Road                                                       

Middleton, MA. 01949

Office: OC19H-237

Office Phone: (617) 253-9230

Fax: 617-253-9599

Cell (978) 994-1911

 

 




Archive powered by MHonArc 2.6.24.

Top of Page