sphenix-maps-l AT lists.bnl.gov
Subject: sPHENIX MAPS tracker discussion
List archive
Re: [Sphenix-maps-l] [EXTERNAL] If in the future we need to remove the MVTX detector - - - -
- From: "Liu, Ming Xiong" <mliu AT lanl.gov>
- To: "Sondheim, Walter E" <sondheim AT lanl.gov>, "SPHENIX MVTX " <sphenix-maps-l AT lists.bnl.gov>
- Subject: Re: [Sphenix-maps-l] [EXTERNAL] If in the future we need to remove the MVTX detector - - - -
- Date: Wed, 8 May 2024 21:44:22 +0000
Thank you Walt for the suggestions.
Cheers, Ming
-- Dr. Ming Xiong Liu P-3 Group, MS H846 Nuclear and Particle Physics & Applications Physics Division
Office: 505.667.7125 Mobile: 505.412.7396 Los Alamos National Laboratory
From:
sPHENIX-MAPS-l <sphenix-maps-l-bounces AT lists.bnl.gov> on behalf of SPHENIX MVTX <sphenix-maps-l AT lists.bnl.gov>
Greetings, if in the future we need to remove the MVTX detector to make adjustments to the X-wing to have the detector better centered around the beampipe – I would suggest installing the MVTX mock-up detector. With this detector mounted to the X-wing making any necessary shims to better center the detector’s North end may be that much easier and less dangerous to the assembled MVTX, not tot mention NO services to be in the way. As you may remember the mock-up is suppose to represent the same mass as the assembled detector. I believe this may be the only way we can work with BNL survey to verify that both ends of the MVTX are in agreement with the beam-axis. Please remember the preface to this message is IF NEEDED! Cheers, Walter |
-
[Sphenix-maps-l] If in the future we need to remove the MVTX detector - - - -,
Sondheim, Walter E, 05/08/2024
- Re: [Sphenix-maps-l] [EXTERNAL] If in the future we need to remove the MVTX detector - - - -, Liu, Ming Xiong, 05/08/2024
Archive powered by MHonArc 2.6.24.