Skip to Content.
Sympa Menu

sphenix-physics-l - [Sphenix-physics-l] near final draft

sphenix-physics-l AT lists.bnl.gov

Subject: sPHENIX discussion of physics

List archive

Chronological Thread  
  • From: David Morrison <dave AT bnl.gov>
  • To: sphenix-physics-l AT lists.bnl.gov, sphenix-l AT lists.bnl.gov
  • Subject: [Sphenix-physics-l] near final draft
  • Date: Sun, 5 Jun 2016 20:33:48 -0400

Dear collaborators,

There was a very good discussion of the response to the ALD’s charge at the Friday general meeting, and here is a draft that incorporates some of the advice we received.  For example, there is now a table of scenarios in the executive summary.  There is also an appendix with summary budget numbers.  We’d like to consider this draft provisionally final (we’d turn off the line numbers in the truly final version of course), but we’d be happy for any specific comments by noon ET on Monday.  After the Friday meeting, we had arranged with Berndt Mueller to move the deadline from Friday to Monday.

https://www.dropbox.com/s/qsy19ir6z551ls1/draft_v3.pdf?dl=0

I’m tripping over some technical problems trying to produce a diff between this version and the previous one, but if I manage to overcome those I’ll post a link to a diff too.

Regards,
Dave and Gunther

David Morrison Brookhaven National Laboratory phone: 631-344-5840
Physics Department, Bldg 510 C email: dave AT bnl.gov
Upton, NY 11973-5000





Attachment: signature.asc
Description: Message signed with OpenPGP using GPGMail




Archive powered by MHonArc 2.6.24.

Top of Page