sphenix-production-l AT lists.bnl.gov
Subject: Sphenix-production-l mailing list
List archive
[Sphenix-production-l] ana.395/2023p007 production ready.
- From: Alex Lebedev <lebedev AT iastate.edu>
- To: sphenix-production-l AT lists.bnl.gov
- Subject: [Sphenix-production-l] ana.395/2023p007 production ready.
- Date: Tue, 26 Dec 2023 10:40:56 -0600
Hello all,
New production with software tag ana.395 and database
tag 2023p007 is ready.
As usual, please use CreateDstList.pl to get a list of available DSTs.
Here is the summary of changes compared to the last production
compiled by Blair:
Tower QA: Bug fix in the calotowerstatus which now correctly sets
the isBadTiming and isHot (from chi2).
Addition of EMCal hot tower maps based on the irregular frequency
of hits which is also included in the isHot status field.
Cluster hot tower masking: Towers which do not pass the QA are
Cluster hot tower masking: Towers which do not pass the QA are
set to zero energy in the clusterizer. This is a minimal level of QA
and analyzers should consider more stringent criteria.
Sasha.
- [Sphenix-production-l] ana.395/2023p007 production ready., Alex Lebedev, 12/26/2023
Archive powered by MHonArc 2.6.24.