Skip to Content.
Sympa Menu

sphenix-production-l - [[Sphenix-production-l] ] Run 21/22 no pileup simulations ready

sphenix-production-l AT lists.bnl.gov

Subject: Sphenix-production-l mailing list

List archive

Chronological Thread  
  • From: pinkenburg <pinkenburg AT bnl.gov>
  • To: "sphenix-production-l AT lists.bnl.gov" <sphenix-production-l AT lists.bnl.gov>
  • Subject: [[Sphenix-production-l] ] Run 21/22 no pileup simulations ready
  • Date: Mon, 9 Dec 2024 11:54:04 -0500

Hi folks,

the simulations for the calorimeters (where we don't really need pileup) are done. The outdated sims were removed, so you will get the up to date sims.  Run 21 uses the vertex distribution for the 0mRad beam crossing, run 22 is 1.5mRad.

For both runs we have 10M events each of these types:
    11 : JS pythia8 Jet ptmin = 30GeV
    12 : JS pythia8 Jet ptmin = 10GeV
    26 : JS pythia8 Detroit
    27 : JS pythia8 Photonjet ptmin = 5GeV
    28 : JS pythia8 Photonjet ptmin = 10GeV
    29 : JS pythia8 Photonjet ptmin = 20GeV

The simulations include the tracking pass tracking

use
CreateFileList.pl -run 21 -type 11 -nop DST_CALO_CLUSTER

For run 22 we also have pileup (300kHz, 700, 1100 kHz). The calos are only sensitive for interactions within the same bunchcrossing, if you want to see how this affects your data, use run 22. The pileup scenarios are stil running, you might not find the one you are looking for. The pileup rate is a parameter (in kHz):
 CreateFileList.pl -run 22 -type 12 -pileup 300 DST_CALO_CLUSTER

Last not least, we have single particle sims for gamma,s pi0 and etas (using a +-120cm vertex range and |eta| <2 to have full coverage even at vertices at 120cm):
CreateFileList.pl -type 14 -run 24

Chris

--
*************************************************************

Christopher H. Pinkenburg ; pinkenburg AT bnl.gov
; http://www.phenix.bnl.gov/~pinkenbu

Brookhaven National Laboratory ; phone: (631) 344-5692
Physics Department Bldg 510 C ; fax: (631) 344-3253
Upton, NY 11973-5000

*************************************************************



  • [[Sphenix-production-l] ] Run 21/22 no pileup simulations ready, pinkenburg, 12/09/2024

Archive powered by MHonArc 2.6.24.

Top of Page