Re: [sphenix-sepd-l] support structure for sEPD SiPM Box
- From: "Park, JaeBeom" <jpark4 AT bnl.gov>
- To: "Mannel, Eric" <mannel AT bnl.gov>, Rosi Reed <rosijreed AT lehigh.edu>
- Cc: "sphenix-sepd-l AT lists.bnl.gov" <sphenix-sepd-l AT lists.bnl.gov>, "Cacace, Daniel" <dcacace AT bnl.gov>, "Feder, Russell" <rfeder AT bnl.gov>
- Subject: Re: [sphenix-sepd-l] support structure for sEPD SiPM Box
- Date: Sat, 25 Feb 2023 01:35:23 +0000
Hi Eric,
OK great I will see you in 11AM on Monday.
For the test, I think to use something like a rope makes sense. Let me look around if we have smth we can use for that.
Best,
Jaebeom
From: Eric Mannel <mannel AT bnl.gov>
Sent: Friday, February 24, 2023 8:09:53 PM
To: Park, JaeBeom <jpark4 AT bnl.gov>; Rosi Reed <rosijreed AT lehigh.edu>
Cc: Cacace, Daniel <dcacace AT bnl.gov>; sphenix-sepd-l AT lists.bnl.gov <sphenix-sepd-l AT lists.bnl.gov>; Feder, Russell <rfeder AT bnl.gov>
Subject: Re: [sphenix-sepd-l] support structure for sEPD SiPM Box
Sent: Friday, February 24, 2023 8:09:53 PM
To: Park, JaeBeom <jpark4 AT bnl.gov>; Rosi Reed <rosijreed AT lehigh.edu>
Cc: Cacace, Daniel <dcacace AT bnl.gov>; sphenix-sepd-l AT lists.bnl.gov <sphenix-sepd-l AT lists.bnl.gov>; Feder, Russell <rfeder AT bnl.gov>
Subject: Re: [sphenix-sepd-l] support structure for sEPD SiPM Box
JaeBeom-
I will be available Monday after 11:00 am. For the first test pull, I would suggest just using a piece of rope. It will be easier to pull through different routing paths and will not risk damaging the expensive cables if we have to try different paths
to minimize the length.
Eric
On 2/24/2023 5:19 PM, Park, JaeBeom wrote:
Hi all,
Sorry for jumping in but just to give you more clear information.We had a chance later this afternoon to discuss some details for the box and for the cables which two are relevant (cc Eric in particular for this task).
So the summary is as following — and @Micah you can maybe add a summary as well for the meeting on Monday (we can discuss offline as well if you want)
1. Current suggestion of the SiPM box is “WEST” side. It was originally suggested in the East side but that side became a bit packed because of MVTX stuff.
2. We have more room in the west side and as seen in the picture, the box fits well in the north side. The box will be attached to the two aluminum bars and those will be attached to the rail in the picture where the cables are inserted. We confirmed with the engineer team (Dan) that we have enough space for that and the current cables do not need to be moved. Also confirmed with John Haggerty.
3. We could not put the mockup box in the southern side because there was some activity ongoing there while we had all relevant people around. We took a picture afterwards and the space is similar to the north side.
4. One of the check we want to do is to test with a bundle of signal cables (meritec) to see if the length really fits to this position. The north side seems to be obviously fine while the cables should have to around a bit in the south side.—> For this, I talked with Eric and will arrange next Monday to find a time to test - label - bundle the meritec cables in highbay next week.—> Perhaps then we can test with the bundled four cables to see if the length is good enough or not.
Best,JaeBeom
2023. 2. 24. 오후 4:55, Rosi Reed <rosijreed AT lehigh.edu> 작성:
_______________________________________________Hi Dan and Russ (sEPD team in cc),Micah and Jaebeom have taken some nice photos of our mock-up sEPD box in the proposed location, see: https://indico.bnl.gov/event/18317/contributions/73680/attachments/46200/78145/SiPM%20Box%20Model.pdf (if the link stops working, they'll be posted at - https://indico.bnl.gov/event/18317/ we are still working on our draft).
The frame that they mocked up was designed for the other location, I suspect just from the photos that some design changes will be needed. Please let our team know if you would like additional photos (and of what) to help with the design. We will also discuss this further in the sEPD Tuesday engineering meeting.
Regards,Rosi
--
Rosi Reed
RHIC/AGS UEC member
Associate Professor, Physics Department
Lehigh University
(610)758-3907
16 Memorial Drive East Office 406
Bethlehem, PA 18015
she/her/hers
sPHENIX-sEPD-l mailing list
sPHENIX-sEPD-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/sphenix-sepd-l
-- Eric J. Mannel, Ph.D. Research Engineer Dept of Physics/PHENIX Brookhaven National Laboratory 631/344-7626 (Office) 914/659-3235 (cell)
-
[sphenix-sepd-l] support structure for sEPD SiPM Box,
Rosi Reed, 02/24/2023
-
Re: [sphenix-sepd-l] support structure for sEPD SiPM Box,
Feder, Russell, 02/24/2023
- Re: [sphenix-sepd-l] support structure for sEPD SiPM Box, Feder, Russell, 02/24/2023
-
Re: [sphenix-sepd-l] support structure for sEPD SiPM Box,
Park, JaeBeom, 02/24/2023
-
Re: [sphenix-sepd-l] support structure for sEPD SiPM Box,
Eric Mannel, 02/24/2023
- Re: [sphenix-sepd-l] support structure for sEPD SiPM Box, Park, JaeBeom, 02/24/2023
-
Re: [sphenix-sepd-l] support structure for sEPD SiPM Box,
Eric Mannel, 02/24/2023
-
Re: [sphenix-sepd-l] support structure for sEPD SiPM Box,
Feder, Russell, 02/24/2023
Archive powered by MHonArc 2.6.24.