sphenix-sepd-l AT lists.bnl.gov
Subject: sPHENIX Event Plane Detector discussion
List archive
- From: Rosi Reed <rosijreed AT lehigh.edu>
- To: sphenix-sepd-l AT lists.bnl.gov
- Subject: [sphenix-sepd-l] sEPD status from 830 am meeting
- Date: Thu, 13 Apr 2023 10:00:08 -0400
Hi sEPDers,
As you saw, the North side frame is in. The South side frame will go in, have its survey done and the check with the sEPD petals likely by tomorrow afternoon. At that point, we can finish putting the sectors on the strongback for the other side.
There needs to be a discussion on the date for the install of the disk, so we don't have a definitive date for that. This will give us a little time to do the light tightening of the sectors after installation into the Stongback, so we are ready to go once we have a date. We may not have that much "forewarning" of it.
Regards,
Rosi
--
Rosi Reed
RHIC/AGS UEC member
Associate Professor, Physics Department
Lehigh University
(610)758-3907
16 Memorial Drive East Office 406
Bethlehem, PA 18015
she/her/hers
RHIC/AGS UEC member
Associate Professor, Physics Department
Lehigh University
(610)758-3907
16 Memorial Drive East Office 406
Bethlehem, PA 18015
she/her/hers
- [sphenix-sepd-l] sEPD status from 830 am meeting, Rosi Reed, 04/13/2023
Archive powered by MHonArc 2.6.24.