Skip to Content.
Sympa Menu

sphenix-software-l - [Sphenix-software-l] G4_Magnet.C macro changes

sphenix-software-l AT lists.bnl.gov

Subject: sPHENIX discussion of software

List archive

Chronological Thread  
  • From: pinkenburg <pinkenburg AT bnl.gov>
  • To: "sphenix-software-l AT lists.bnl.gov" <sphenix-software-l AT lists.bnl.gov>
  • Subject: [Sphenix-software-l] G4_Magnet.C macro changes
  • Date: Fri, 31 Jul 2015 19:05:34 -0400

Hi folks,

I modified and committed the Babar magnet in our simulations according to the following numbers:

inner radius thickness length
Cryostat inner wall 1420 10.0 3790
Coil and bobbin 1508 93.8 3615
Cryostat outer wall 1745 25.0 3790

The material is Al 5083 (5%Mg, 0.4%Mn). Previously it was an Al cylinder of 1/3rd of the normal density. The main difference is that the radiation length went from 1 to ~1.4. The cryostat doss not have endcaps yet.

Chris

--
*************************************************************

Christopher H. Pinkenburg ; pinkenburg AT bnl.gov
; http://www.phenix.bnl.gov/~pinkenbu

Brookhaven National Laboratory ; phone: (631) 344-5692
Physics Department Bldg 510 C ; fax: (631) 344-3253
Upton, NY 11973-5000

*************************************************************




  • [Sphenix-software-l] G4_Magnet.C macro changes, pinkenburg, 07/31/2015

Archive powered by MHonArc 2.6.24.

Top of Page