sphenix-software-l AT lists.bnl.gov
Subject: sPHENIX discussion of software
List archive
[Sphenix-software-l] evaluator problems with 64 bit hit ids
- From: Chris Pinkenburg <pinkenburg AT bnl.gov>
- To: sphenix-software-l AT lists.bnl.gov
- Subject: [Sphenix-software-l] evaluator problems with 64 bit hit ids
- Date: Tue, 11 Aug 2015 17:00:02 -0400
Hi folks,
I tracked the evaluator problem in the silicon down to an inconsistent typedef which is now fixed (it now uses the typedef from the PHG4HitContainer instead of a copy). But that's not the end of it - while the tracking evaluator works now I need to do some 32->64 bit hit id adjusting for the PHG4Cells (and maybe more once they are okay) before the calorimeter evaluators work again. But that doesn't delay any simulation running since the cells are created in the analysis stage. Chris On 08/11/2015 04:41 PM, Huang, Jin wrote: This minutes is also available on today’s agenda: https://indico.bnl.gov/conferenceDisplay.py?confId=1186
All: simulation plan for coming reviews
Page 3: Crag: what is the plan for simulating test beam Chris: we will put test beam detector geometry in Geant4. It will be a separated study comparing to this effort.
Many: Do we want to run separate tracking simulation with TPC options? No TPC expert around for the meeting. Need to track down with Alan and Ron.
Action Item [Tony]: plan to run Upsilon simulation to verify the current SVX implementation in GitHub master still maintain good performance (Upsilon mass resolution fo ~100 MeV) after many recent updates.
Page 4: Peter & Chris: there is still some problem on read-in the vertex from HEPMC event. Action Item [Chris]: check event generator vertex implementation.
Page 5: Tony: Recent test showed an error of duplicated G4 hit ID complained from evaluator Action Item [Tony & Chris] : check whether the problem still show up after the newest nightly build and local build.
Abhisek: one possible way to specify the production setup is to tag the production macros on GitHub
Page 6: Chris: Embedding with two G4Hit input stream not yet implemented Action Item [Need volunteer]: module and procedure to enable embed one PHG4Hit DST stream (usually Jets or single particle) to the other stream (usually HIJING).
Page 7: Chris: tracking code should be verified and get tagged now
Discussion: Chris: need man power and plots Action Item [John Haggerty]: plan to summarize the basic detector plots needed for the pre-CDR Action Item [Manpower Needed]: analyze the simulation data.
Chris: should start a test production as soon as possible. We are close to have everything ready (now pending on verifications for the implementation of projective EMCal and SVX tracker). Action Item [Jin]: verify the new 2DSpacal branch and merge it to master. Then a test production can start
Abhisek: single particle in Hcal
Page 2: Chris: another ntuple module?? Abhisek,
John and Jin: No.
Page 3: Chris: the phi dependence probably comes from the beat between frequency of the steel plate the frequency of phi angle scan point. To avoid such beat, We can either adjust N phi-bin to a large number or an integral of . Action Item [Abhisek] : please run the material scan again following Chris’ suggestion. It will be great that we verify it and be sure of the new material distribution before the production starts.
Page 7: Craig: energy resolution too good? Action Item [Abhisek] : 1. Check towered/clustered energy resolution which would take into account of lateral leakage. 2. Cross check with Liang's study for the last generation of G4 HCal setup.
Page 8: John L. and Jin: expected proton shower energy is the kinematic energy of the input proton. They leads to this apparent divergent at lower total energy points. Action Item [Abhisek] : please try kinematic energy as the x-axis for proton leakage/resolution study
______________________________
Jin HUANG
Brookhaven National Laboratory Physics Department, Bldg 510 C Upton, NY 11973-5000
Office: 631-344-5898 Cell: 757-604-9946 ______________________________
From:
sphenix-l-bounces AT lists.bnl.gov
[mailto:sphenix-l-bounces AT lists.bnl.gov]
On Behalf Of Huang, Jin
Dear All,
This is reminder of our weekly sPHENIX simulation meeting Tue Aug 11th 1-3PM. For residents at BNL, we will meet in the 2-187 conference room (for this week only).
We will start the meeting by discussing software readiness and simulation plan for coming reviews and pre-CDR writing. More updates and contributions are welcomed too.
The agenda page is at https://indico.bnl.gov/conferenceDisplay.py?confId=1186 , for which the modification password is 1008
To join via Browser: https://bluejeans.com/377457648/browser
To join via Phone: 1) Dial: +1 408 740 7256 +1 888 240 2560(US Toll Free) +1 408 317 9253(Alternate Number) (see all numbers - http://bluejeans.com/numbers) 2) Enter Conference ID: 377457648
Cheers,
Jin
______________________________
Jin HUANG
Brookhaven National Laboratory Physics Department, Bldg 510 C Upton, NY 11973-5000
Office: 631-344-5898 Cell: 757-604-9946 ______________________________
_______________________________________________ Sphenix-software-l mailing list Sphenix-software-l AT lists.bnl.gov https://lists.bnl.gov/mailman/listinfo/sphenix-software-l -- ********************************************************* Christopher H. Pinkenburg ; pinkenburg AT bnl.gov Brookhaven National Laboratory ; phone: (631) 344-5692 Physics Department Bldg 510 C ; fax: (631) 344-3253 Upton, NY 11973-5000 http://www.phenix.bnl.gov/~pinkenbu/ ********************************************************* |
-
[Sphenix-software-l] [minutes] sPHENIX simulation meeting, Tue Aug 11th 1-3PM @ 2-187,
Huang, Jin, 08/11/2015
-
[Sphenix-software-l] evaluator problems with 64 bit hit ids,
Chris Pinkenburg, 08/11/2015
-
Re: [Sphenix-software-l] evaluator problems with 64 bit hit ids,
Michael P. McCumber, 08/11/2015
-
Re: [Sphenix-software-l] evaluator problems with 64 bit hit ids,
pinkenburg, 08/12/2015
- Re: [Sphenix-software-l] evaluator problems with 64 bit hit ids, Michael P. McCumber, 08/12/2015
-
Re: [Sphenix-software-l] evaluator problems with 64 bit hit ids,
pinkenburg, 08/12/2015
-
Re: [Sphenix-software-l] evaluator problems with 64 bit hit ids,
Michael P. McCumber, 08/11/2015
-
Re: [Sphenix-software-l] [minutes] sPHENIX simulation meeting, Tue Aug 11th 1-3PM @ 2-187,
Soltz, Ron, 08/12/2015
-
Re: [Sphenix-software-l] [minutes] sPHENIX simulation meeting, Tue Aug 11th 1-3PM @ 2-187,
Huang, Jin, 08/12/2015
- Re: [Sphenix-software-l] [minutes] sPHENIX simulation meeting, Tue Aug 11th 1-3PM @ 2-187, Alan Dion, 08/12/2015
- Re: [Sphenix-software-l] [minutes] sPHENIX simulation meeting, Tue Aug 11th 1-3PM @ 2-187, Huang, Jin, 08/13/2015
-
Re: [Sphenix-software-l] [minutes] sPHENIX simulation meeting, Tue Aug 11th 1-3PM @ 2-187,
Huang, Jin, 08/12/2015
-
[Sphenix-software-l] evaluator problems with 64 bit hit ids,
Chris Pinkenburg, 08/11/2015
Archive powered by MHonArc 2.6.24.