Hi folks,
the last tracking job just finished, all DSTs for the 1M c-cbar events are available now. The magic incantation is:
CreateFileList.pl -run 6 -type 7 -nop DST_TRACKS
(-nop for "no pileup", the script defaults to 3MHz pileup which wasn't run). These are single c-cbar pythia8 events (no pileup with pp or embedded into hijing).
Chris
--
*************************************************************
Christopher H. Pinkenburg ; pinkenburg AT bnl.gov
; http://www.phenix.bnl.gov/~pinkenbu
Brookhaven National Laboratory ; phone: (631) 344-5692
Physics Department Bldg 510 C ; fax: (631) 344-3253
Upton, NY 11973-5000
*************************************************************
- [Sphenix-software-l] 1M c-cbar HF test production finished, pinkenburg, 03/01/2023
Archive powered by MHonArc 2.6.24.