Skip to Content.
Sympa Menu

sphenix-software-l - [Sphenix-software-l] 1M c-cbar HF test production finished

sphenix-software-l AT lists.bnl.gov

Subject: sPHENIX discussion of software

List archive

Chronological Thread  
  • From: pinkenburg <pinkenburg AT bnl.gov>
  • To: "sphenix-software-l AT lists.bnl.gov" <sphenix-software-l AT lists.bnl.gov>
  • Subject: [Sphenix-software-l] 1M c-cbar HF test production finished
  • Date: Wed, 1 Mar 2023 09:44:22 -0500

Hi folks,

the last tracking job just finished, all DSTs for the 1M c-cbar events are available now. The magic incantation is:

CreateFileList.pl -run 6 -type 7 -nop DST_TRACKS

(-nop for "no pileup", the script defaults to 3MHz pileup which wasn't run). These are single c-cbar pythia8 events (no pileup with pp or embedded into hijing).

Chris

--
*************************************************************

Christopher H. Pinkenburg ; pinkenburg AT bnl.gov
; http://www.phenix.bnl.gov/~pinkenbu

Brookhaven National Laboratory ; phone: (631) 344-5692
Physics Department Bldg 510 C ; fax: (631) 344-3253
Upton, NY 11973-5000

*************************************************************




  • [Sphenix-software-l] 1M c-cbar HF test production finished, pinkenburg, 03/01/2023

Archive powered by MHonArc 2.6.24.

Top of Page