sphenix-software-l AT lists.bnl.gov
Subject: sPHENIX discussion of software
List archive
[Sphenix-software-l] sim (+geometry fix) status - pp MB is next
- From: pinkenburg <pinkenburg AT bnl.gov>
- To: "sphenix-software-l AT lists.bnl.gov" <sphenix-software-l AT lists.bnl.gov>
- Subject: [Sphenix-software-l] sim (+geometry fix) status - pp MB is next
- Date: Thu, 6 Jul 2023 10:11:33 -0400
Hi folks,
the MB AuAu data have been repaired (almost - about 20k DST_TRUTH and DST_TRKR_HIT files are still in the pipeline). I tested the new calorimeter clustering without vertex and it works. I am reprocessing the DST_CALO_CLUSTER files with the new code (the first 20k are done, finishing this should be today). Unlike previously those files do not contain the GlobalVertexMap (so don't ask them for a vertex). Temporarily you can use the DST_VERTEX files to get this (the old calo files just contained a copy of it anyway). I didn't rename the old DST_CALO_CLUSTER files, so the lists don't work right now (sorry - should have done this). The old files still exist under /sphenix/lustre01/sphnxpro/mdc2old/shijing_hepmc/fm_0_20/calocluster/run0006/, if you prepend the filenames in your file list with this path, your code will be able to use them.
Once the calorimeter reconstruction is finished, we will re-run the tracking with our current version. The old DST_TRACKS will be renamed to DSTOLD_TRACKS so they are available during this time (and will be removed once the tracking is done)
Next in line for the geometry fix is the MB pp data. It will follow the same approach, renaming the G4Hits, DST_XXX_G4HIT, DST_TRKR_HIT and DST_TRUTH files to apply the geometry fix and then rerunning the reconstruction (calorimeter, global, tracking).
Chris
-- ************************************************************* Christopher H. Pinkenburg ; pinkenburg AT bnl.gov ; http://www.phenix.bnl.gov/~pinkenbu Brookhaven National Laboratory ; phone: (631) 344-5692 Physics Department Bldg 510 C ; fax: (631) 344-3253 Upton, NY 11973-5000 *************************************************************
- [Sphenix-software-l] sim (+geometry fix) status - pp MB is next, pinkenburg, 07/06/2023
Archive powered by MHonArc 2.6.24.