sphenix-software-l AT lists.bnl.gov
Subject: sPHENIX discussion of software
List archive
[[Sphenix-software-l] ] cdb still down after power outage, condor submission will be reopened
- From: pinkenburg <pinkenburg AT bnl.gov>
- To: "sphenix-software-l AT lists.bnl.gov" <sphenix-software-l AT lists.bnl.gov>
- Subject: [[Sphenix-software-l] ] cdb still down after power outage, condor submission will be reopened
- Date: Fri, 7 Mar 2025 18:02:53 -0500
Hi folks,
the cdb isn't back up yet, but condor submission will be re-enabled in a couple of minutes. Please be mindful that any job which needs the cdb is going to fail miserably.
Chris
--
*************************************************************
Christopher H. Pinkenburg ; pinkenburg AT bnl.gov
; http://www.phenix.bnl.gov/~pinkenbu
Brookhaven National Laboratory ; phone: (631) 344-5692
Physics Department Bldg 510 C ; fax: (631) 344-3253
Upton, NY 11973-5000
*************************************************************
- [[Sphenix-software-l] ] cdb still down after power outage, condor submission will be reopened, pinkenburg, 03/07/2025
Archive powered by MHonArc 2.6.24.