oops, I got the date wrong...
Thanks,
Tom
On Wed, Jul 1, 2020 at 10:04 AM Takao Sakaguchi <takao AT bnl.gov> wrote:
Hi Tom,
Thanks for the input. Indeed, the meeting will be held tomorrow
morning (Thursday, Jul 2).
I will put the list on my slide for discussion.
Takao
On 7/1/20 10:01 AM, Thomas K Hemmick wrote:
Because this interferes with the engineering meeting, I will not make it. Although I know this meeting is mostly about testing the FEE cards, please remember that the FEE cards will also be used to test other things. Here is a brief set of comments:
- We would like to test the pad planes by coupling a pulse into them via a GEM or GEM-like structure. This needs:
We would like to perform X-ray based characterization tests on each module.
- A number of cards equal to the population (12 for R3, 8 for R3, 6 for R1)
- A readout system that allows for a trigger applied externally.
- DAM card (we should provide PC)...
Thanks,
- Same list of equipment as above.
- Should run zero-suppressed but without trigger.
Tom
On Wed, Jul 1, 2020 at 9:46 AM Takao Sakaguchi <takao AT bnl.gov> wrote:
Dear All,
Sorry for short notice. We will hold a meeting tomorrow
to discuss the testing plan for the TPC signal readout, as
its hardware development phase is finishing up. The idea
is to review the status and discuss testing plan of the
readout system from now till the TPC installation starting
Jun 3, 2021.
The meeting will be held from 10:30am till 12:00pm.
The meeting indico page is here:
https://indico.bnl.gov/event/8866/
Best,
Takao
_______________________________________________
Sphenix-tpc-l mailing list
Sphenix-tpc-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/sphenix-tpc-l
-
[Sphenix-tpc-l] TPC signal readout testing plan meeting at 10:30am on Jul 2 (tomorrow),
Takao Sakaguchi, 07/01/2020
-
Re: [Sphenix-tpc-l] TPC signal readout testing plan meeting at 10:30am on Jul 2 (tomorrow),
Thomas K Hemmick, 07/01/2020
-
Re: [Sphenix-tpc-l] TPC signal readout testing plan meeting at 10:30am on Jul 2 (tomorrow),
Takao Sakaguchi, 07/01/2020
- Re: [Sphenix-tpc-l] TPC signal readout testing plan meeting at 10:30am on Jul 2 (tomorrow), Thomas K Hemmick, 07/01/2020
-
Re: [Sphenix-tpc-l] TPC signal readout testing plan meeting at 10:30am on Jul 2 (tomorrow),
Takao Sakaguchi, 07/01/2020
-
Re: [Sphenix-tpc-l] TPC signal readout testing plan meeting at 10:30am on Jul 2 (tomorrow),
Thomas K Hemmick, 07/01/2020
Archive powered by MHonArc 2.6.24.