sphenix-tracking-l AT lists.bnl.gov
Subject: sPHENIX tracking discussion
List archive
Re: [Sphenix-tracking-l] [EXTERNAL] 20 segments with current G4 (10.07.p03)
- From: pinkenburg <pinkenburg AT bnl.gov>
- To: "Osborn, Joe" <osbornjd AT ornl.gov>, Anthony Frawley <afrawley AT fsu.edu>, sphenix-tracking <sphenix-tracking-l AT lists.bnl.gov>
- Subject: Re: [Sphenix-tracking-l] [EXTERNAL] 20 segments with current G4 (10.07.p03)
- Date: Tue, 21 Jun 2022 15:16:01 -0400
Hi Joe,
the truth files for the no pileup are in
/sphenix/sim/sim01/sphnxpro/mdc2/shijing_hepmc/fm_0_20/nopileup/trkrhit
but it looks like I didn't add the run=40 files to the file catalog. Did this just now
Sorry
Chris
In each the g11 and g10 case, the silicon-tpc track matcher runs in ~130 ms per event when running over these first 26 events. The silicon seed merger runs in ~340 ms per event in g10, and ~560 ms per event in g11, so there is a nontrivial difference there in terms of the number of silicon seeds produced in g11 vs. g10. It occurred to me that this would be useful information, so I added the number of silicon seeds found in each of the events in the two geant versions to the spreadsheet. There are two interesting observations:
Chris can correct me if I’m wrong, but I don’t see the corresponding truth DSTs for these runs. Are they available somewhere?
From:
Anthony
Frawley <afrawley AT fsu.edu>
Date: Tuesday, June 21, 2022 at 2:20 PM
To: pinkenburg <pinkenburg AT bnl.gov>,
sphenix-tracking <sphenix-tracking-l AT lists.bnl.gov>,
Osborn, Joe <osbornjd AT ornl.gov>
Subject: Re: [Sphenix-tracking-l] [EXTERNAL] 20
segments with current G4 (10.07.p03)
Hi Joe,
That is puzzling. I don't understand how it could have been this way previously without us noticing it. There are 26 events, of which 6 (20-25%) have a number of clusters in the MVTX that would imply 1000 tracks. Before the recent optimization of the silicon-tpc track matcher loop, this should have made the matching very slow.
Is it possible to extract the number of truth tracks for these events?
Tony
From: sPHENIX-tracking-l
<sphenix-tracking-l-bounces AT lists.bnl.gov> on behalf
of Osborn, Joe via sPHENIX-tracking-l
<sphenix-tracking-l AT lists.bnl.gov>
Sent: Tuesday, June 21, 2022 1:57 PM
To: pinkenburg <pinkenburg AT bnl.gov>;
sphenix-tracking <sphenix-tracking-l AT lists.bnl.gov>
Subject: Re: [Sphenix-tracking-l] [EXTERNAL] 20
segments with current G4 (10.07.p03)
Hi all,
Okay, Chris re-ran some jobs with no pile up. This is because the pile up is thrown randomly, so there is already inherently a level of irreproducibility. The new files have the same HEPMC input and just run the reconstruction before adding pileup (I think, Chris can correct me if I’m wrong).
I made a quick spreadsheet of the number of silicon clusters in the MVTX to seed with in each version of geant11 and geant10.07.03:
hxxps://docs.google.com/spreadsheets/d/1wgW2ev6TZpLlB52Wx_xMrlpI_RWsxLWFHF_5ORlFcQU/edit?usp=sharing
Nothing stands out as too egregious – there are a few events where there are large differences between the geant versions but otherwise they are reasonably comparable.
Is there any way to run with the same
pile up environment in each version as well? i.e. remove
this random element from the simulation?
Joe
From:
sPHENIX-tracking-l
<sphenix-tracking-l-bounces AT lists.bnl.gov> on
behalf of pinkenburg via sPHENIX-tracking-l
<sphenix-tracking-l AT lists.bnl.gov>
Date: Saturday, June 18, 2022 at 11:01 AM
To: sphenix-tracking
<sphenix-tracking-l AT lists.bnl.gov>
Subject: [EXTERNAL] [Sphenix-tracking-l] 20
segments with current G4 (10.07.p03)
Hi folks,
I ran 20 segments using the current new build using G4
10.07.p03. They
use runnumber 40. All files are in lustre and gpfs. The
trackseeds are in
/sphenix/sim/sim01/sphnxpro/mdc2/shijing_hepmc/fm_0_20/trackseeds
the clusters are in
/sphenix/sim/sim01/sphnxpro/mdc2/shijing_hepmc/fm_0_20/trkrcluster
you can use the CreateFileList.pl to get a list of those
files via:
CreateFileList.pl -type 4 -run 40 DST_TRKR_CLUSTER
or
CreateFileList.pl -type 4 -run 40 DST_TRACKSEEDS
The tracking (job C) right now bombs out with
/home/phnxbld/sPHENIX/gcc-8.3/new/source/coresoftware/offline/packages/trackreco/PHActsTrkFitter.cc:1097:
TpcTrackSeedContainer not on node tree. Bailing
It looks like the node names in pass A have changed.
The old G4 version (11.0.0) can be found under runnumber
4
Chris
--
*************************************************************
Christopher H. Pinkenburg ; pinkenburg AT bnl.gov
;
hxxp://www.phenix.bnl.gov/~pinkenbu
Brookhaven National Laboratory ; phone: (631)
344-5692
Physics Department Bldg 510 C ; fax: (631)
344-3253
Upton, NY 11973-5000
*************************************************************
_______________________________________________
sPHENIX-tracking-l mailing list
sPHENIX-tracking-l AT lists.bnl.gov
hxxps://lists.bnl.gov/mailman/listinfo/sphenix-tracking-l
-- ************************************************************* Christopher H. Pinkenburg ; pinkenburg AT bnl.gov ; http://www.phenix.bnl.gov/~pinkenbu Brookhaven National Laboratory ; phone: (631) 344-5692 Physics Department Bldg 510 C ; fax: (631) 344-3253 Upton, NY 11973-5000 *************************************************************
-
[Sphenix-tracking-l] 20 segments with current G4 (10.07.p03),
pinkenburg, 06/18/2022
-
Re: [Sphenix-tracking-l] [EXTERNAL] 20 segments with current G4 (10.07.p03),
Osborn, Joe, 06/21/2022
-
Re: [Sphenix-tracking-l] [EXTERNAL] 20 segments with current G4 (10.07.p03),
Anthony Frawley, 06/21/2022
-
Re: [Sphenix-tracking-l] [EXTERNAL] 20 segments with current G4 (10.07.p03),
Osborn, Joe, 06/21/2022
- Re: [Sphenix-tracking-l] [EXTERNAL] 20 segments with current G4 (10.07.p03), pinkenburg, 06/21/2022
-
Re: [Sphenix-tracking-l] [EXTERNAL] 20 segments with current G4 (10.07.p03),
Osborn, Joe, 06/21/2022
-
Re: [Sphenix-tracking-l] [EXTERNAL] 20 segments with current G4 (10.07.p03),
Anthony Frawley, 06/21/2022
-
Re: [Sphenix-tracking-l] [EXTERNAL] 20 segments with current G4 (10.07.p03),
Osborn, Joe, 06/21/2022
Archive powered by MHonArc 2.6.24.