sphenix-tracking-l AT lists.bnl.gov
Subject: sPHENIX tracking discussion
List archive
Re: [[Sphenix-tracking-l] ] [[Sphenix-run-l] ] 111x111-bunched fill GEM stability test run report
- From: David Morrison <dave.patrick.morrison AT gmail.com>
- To: "Huang, Jin" <jhuang AT bnl.gov>, "sphenix-tpc-l AT lists.bnl.gov" <sphenix-tpc-l AT lists.bnl.gov>
- Cc: "sphenix-tracking-l AT lists.bnl.gov" <sphenix-tracking-l AT lists.bnl.gov>, "sphenix-run-l AT lists.bnl.gov" <sphenix-run-l AT lists.bnl.gov>
- Subject: Re: [[Sphenix-tracking-l] ] [[Sphenix-run-l] ] 111x111-bunched fill GEM stability test run report
- Date: Sat, 10 Aug 2024 07:07:55 -0400
Hi all, Congratulations! That's really encouraging progress! Cheers, Dave On 8/9/24 11:30 PM, Huang, Jin wrote:
Hi Everyone
Today the TPC group achieved a stable operation of the chamber in the 111x111-bunch fill, following two days of hard work on GEM gain balancing and damage survey/compensation by Tom, Evgeny, Charles, and Luke. This is a great start for step 4 in the Isobutane-mixture commissioning [as in accumulating slides deck]. Run log are summarized for the tracking team at https://chat.sdcc.bnl.gov/sphenix/pl/iu75n6tsqfnndkfwtam51ysaic . Few slides below summarizing the run. In meanwhile, significant progress has been made by John Kuczewski on new versions of FEE firmware that stablize high rate zero suppressed data taking. It has been installed on four TPC sectors for final testing with data taking. We aim to collect a large data set of non-zero suppressed data over the weekend for detailed chamber property studies. Cheers Jin for the 1008 crew
______________________________
Jin HUANG
Physicist, Ph.D. Brookhaven National Laboratory Physics Department, Bldg 510 C Upton, NY 11973-5000
Office: 631-344-5898 Cell: 757-604-9946 ______________________________
From: Huang,
Jin <jhuang AT bnl.gov>
Hi Everyone
Sent: Monday, August 5, 2024 12:25 AM To: sphenix-tpc-l AT lists.bnl.gov <sphenix-tpc-l AT lists.bnl.gov> Cc: sphenix-tracking-l AT lists.bnl.gov <sphenix-tracking-l AT lists.bnl.gov>; sphenix-tracking-l AT lists.bnl.gov <sphenix-tracking-l AT lists.bnl.gov>; sphenix-run-l AT lists.bnl.gov <sphenix-run-l AT lists.bnl.gov> Subject: 56x56-bunched fill GEM stability test run report Today the TPC group brought the chamber to operate at 56x56-bunch fill as the next step in the Isobutane-mixture commissioning [as in accumulating slides deck]. Run log are summarized by Joe at https://chat.sdcc.bnl.gov/sphenix/pl/986jagim1tf7ip39broe3pc1kc Although this test is prior to the necessary gain balancing on the TPC GEMs, the results are positive: TPC was stable in 56x56-bunch fill, and for both 0-mard and +1.5mrad crossing angle: this suggest the TPC chamber would be stable at physics-capable working conditions. Data volume is significantly reduced with a MIP-efficient zero suppression setting. And when projected to the 100% streaming configuration, it is plausible to fit into the BBox bandwidth limit. More details below. On the next steps, we expect to work on the HV divider adjustment for gain balancing early next week, and proceed with full 111x111-bunch fills later in the week Cheers Jin
Jin HUANG
Physicist, Ph.D. Brookhaven National Laboratory Physics Department, Bldg 510 C Upton, NY 11973-5000
Office: 631-344-5898 Cell: 757-604-9946 ______________________________
From: Huang,
Jin <jhuang AT bnl.gov>
Hi Everyone
Sent: Saturday, August 3, 2024 12:13 AM To: sphenix-tpc-l AT lists.bnl.gov <sphenix-tpc-l AT lists.bnl.gov> Cc: sphenix-tracking-l AT lists.bnl.gov <sphenix-tracking-l AT lists.bnl.gov>; sphenix-tracking-l AT lists.bnl.gov <sphenix-tracking-l AT lists.bnl.gov>; sphenix-run-l AT lists.bnl.gov <sphenix-run-l AT lists.bnl.gov> Subject: 28x28-bunched fill GEM stability test run report While the TPC gain balancing is still ongoing, we performed 28x28-bunch fill test with TPC today, which was a 4x increase in beam intensity compared to the last run. The main goal was to test GEM activity which is summarized below [as in accumulating slides deck]. nonZS big partition data was taken in this condition, which was summarized by Charles at https://chat.sdcc.bnl.gov/sphenix/pl/x7rogxog6igatkfaiderh5e9dc . The critical path remains with gain balancing TPC under this new operating gas, while we continue to pushing forward towards full lumi operation. Cheers Jin
______________________________
Jin HUANG
Physicist, Ph.D. Brookhaven National Laboratory Physics Department, Bldg 510 C Upton, NY 11973-5000
Office: 631-344-5898 Cell: 757-604-9946 ______________________________
From: Huang,
Jin <jhuang AT bnl.gov>
Hi everyone,
Sent: Wednesday, July 31, 2024 12:03 AM To: sphenix-tpc-l AT lists.bnl.gov <sphenix-tpc-l AT lists.bnl.gov> Cc: sphenix-tracking-l AT lists.bnl.gov <sphenix-tracking-l AT lists.bnl.gov>; sphenix-tracking-l AT lists.bnl.gov <sphenix-tracking-l AT lists.bnl.gov>; sphenix-run-l AT lists.bnl.gov <sphenix-run-l AT lists.bnl.gov> Subject: TPC gain measurement with beam in tracking meeting Wed 11AM Quick reminder that we will use the beginning of the daily tracking meeting at 11AM to discuss analysis of TPC commissioning. https://indico.bnl.gov/event/24184/ In particular, the first beam data with Isobutane gas was collected Tue with the MIP-efficient HV work point determined from the Monday cosmic data [TPC Elog 553]. GEM gain measured with this dataset will allow us to build the Cheers ______________________________
Jin HUANG
Physicist, Ph.D. Brookhaven National Laboratory Physics Department, Bldg 510 C Upton, NY 11973-5000
Office: 631-344-5898 Cell: 757-604-9946 ______________________________
From: Huang,
Jin <jhuang AT bnl.gov>
Hi Everyone
Sent: Monday, July 29, 2024 4:18 PM To: sphenix-tpc-l AT lists.bnl.gov <sphenix-tpc-l AT lists.bnl.gov> Cc: sphenix-tracking-l AT lists.bnl.gov <sphenix-tracking-l AT lists.bnl.gov>; sphenix-tracking-l AT lists.bnl.gov <sphenix-tracking-l AT lists.bnl.gov>; sphenix-run-l AT lists.bnl.gov <sphenix-run-l AT lists.bnl.gov> Subject: Special TPC meeting on cosmic data review, Tue July 30 9:30AM. As just discussed in shift change meeting, we will have a special TPC meeting at Tue July 30 9:30AM tomorrow. Indico and zoom at https://indico.bnl.gov/event/24338/ TPC HV is being ramped for the first time after the new Isobutane gas mixture was circulated since Sat. We aim to collect sufficient cosmic data to establish the new GEM gain and a MIP-efficient HV work point priory to operate with collisions in the next steps. Live action at
https://chat.sdcc.bnl.gov/sphenix/channels/tpc-electronics
There could be many changes of the plan depending on factors
like the detector response, and power stability etc. So, please
stay tuned.
Cheers Jin
______________________________
Jin HUANG
Physicist, Ph.D. Brookhaven National Laboratory Physics Department, Bldg 510 C Upton, NY 11973-5000
Office: 631-344-5898 Cell: 757-604-9946 ______________________________
|
-
[[Sphenix-tracking-l] ] 28x28-bunched fill GEM stability test run report,
Huang, Jin, 08/03/2024
-
[[Sphenix-tracking-l] ] 56x56-bunched fill GEM stability test run report,
Huang, Jin, 08/05/2024
-
[[Sphenix-tracking-l] ] 111x111-bunched fill GEM stability test run report,
Huang, Jin, 08/09/2024
- Re: [[Sphenix-tracking-l] ] [[Sphenix-run-l] ] 111x111-bunched fill GEM stability test run report, David Morrison, 08/10/2024
-
[[Sphenix-tracking-l] ] Aug-11 run report,
Huang, Jin, 08/12/2024
-
[[Sphenix-tracking-l] ] Aug-13 run report,
Huang, Jin, 08/13/2024
-
[[Sphenix-tracking-l] ] Overnight physics run test report,
Huang, Jin, 08/14/2024
-
[[Sphenix-tracking-l] ] Zero suppression tuning run report, Aug-15,
Huang, Jin, 08/16/2024
- [[Sphenix-tracking-l] ] Beam time use report for data pipeline performance tuning, Aug-15, Huang, Jin, 08/21/2024
-
[[Sphenix-tracking-l] ] Zero suppression tuning run report, Aug-15,
Huang, Jin, 08/16/2024
-
[[Sphenix-tracking-l] ] Overnight physics run test report,
Huang, Jin, 08/14/2024
-
[[Sphenix-tracking-l] ] Aug-13 run report,
Huang, Jin, 08/13/2024
- Re: [[Sphenix-tracking-l] ] 111x111-bunched fill GEM stability test run report, Xiaochun He, 08/16/2024
-
[[Sphenix-tracking-l] ] 111x111-bunched fill GEM stability test run report,
Huang, Jin, 08/09/2024
-
[[Sphenix-tracking-l] ] 56x56-bunched fill GEM stability test run report,
Huang, Jin, 08/05/2024
Archive powered by MHonArc 2.6.24.