Skip to Content.
Sympa Menu

star-cf-l - Re: [Star-cf-l] STAR presentation by Zachary Sweger for Quark Matter 2023 submitted for review

star-cf-l AT lists.bnl.gov

Subject: STAR Correlations and Fluctuations PWG

List archive

Chronological Thread  
  • From: 野中俊宏 <nonaka.toshihiro.ge AT u.tsukuba.ac.jp>
  • To: "star-cf-l AT lists.bnl.gov" <star-cf-l AT lists.bnl.gov>
  • Subject: Re: [Star-cf-l] STAR presentation by Zachary Sweger for Quark Matter 2023 submitted for review
  • Date: Thu, 24 Aug 2023 08:21:58 +0000

Dear Zach,

I have some comments on your nice poster presentation.

With these implemented, I sign off.

Best regards,
Toshihiro

1. Introduction
(Critical Fluctuations)
- 1st bullet: Fluctuations of conserved charges
- 4th bullet: Cite Misha’s paper here?

(Cumulants and Moments)
- Cite [1] here?

(Previous Results)
- 2nd bullet: Add [2] at the end of the sentence
- 3rd and 4th bullets: Insert space after “=”.

2. The STAR Fixed-Target Program
- 1st bullet: … cannot operate at Au+Au collisions below 7.7 GeV.
- 3rd bullet: New data from \sqrt{s_NN} = 3.0 - 7.7 GeV

(Challenges)
- 2nd bullet: higher energies, instead of highest energy?
- 3rd bullet: ID -> identification

3. Acceptance
(Top figures) Inside each panel, \sqrt{s_{NN}} = X GeV
(Right bullets)
- 1st bullet: Standard analysis window (write down rapidity and pT acceptance here) shown in…
- 2nd bullet: Insert space after “=”
(Overlap at 7.7 GeV): Insert space after “=”
- 1st bullet: Insert space after “=”
- Middle panel: \sqrt{s_{NN}} = 7.7 GeV

References
[2] (20 2022) -> (2022)
Remove “In” and “p.”





差出人: Star-cf-l <star-cf-l-bounces AT lists.bnl.gov> が webmaster--- via Star-cf-l <star-cf-l AT lists.bnl.gov> の代理で送信
送信日時: 2023年8月21日 12:48
宛先: star-cf-l AT lists.bnl.gov <star-cf-l AT lists.bnl.gov>
CC: webmaster AT star.bnl.gov <webmaster AT star.bnl.gov>
件名: [Star-cf-l] STAR presentation by Zachary Sweger for Quark Matter 2023 submitted for review
 
Dear star-cf-l AT lists.bnl.gov members,

Zachary Sweger (zwsweger AT ucdavis.edu) has submitted a material for a review, 
please have a look:
https://drupal.star.bnl.gov/STAR/node/64782

Deadline: 2023-09-03
---
If you have any problems with the review process, please contact 
webmaster AT www.star.bnl.gov
_______________________________________________
Star-cf-l mailing list
Star-cf-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-cf-l



Archive powered by MHonArc 2.6.24.

Top of Page