star-fcv-l AT lists.bnl.gov
Subject: STAR Flow, Chirality and Vorticity PWG
List archive
Re: [Star-fcv-l] STAR presentation by Ashik Ikbal Sheikh for DNP 2021 submitted for review
- From: ASHIK IKBAL <ashikhep AT gmail.com>
- To: ShinIchi Esumi <esumi.shinichi.gn AT u.tsukuba.ac.jp>, "STAR Flow, Chirality and Vorticity PWG" <star-fcv-l AT lists.bnl.gov>
- Subject: Re: [Star-fcv-l] STAR presentation by Ashik Ikbal Sheikh for DNP 2021 submitted for review
- Date: Wed, 6 Oct 2021 17:59:38 -0400
Dear Shinlchi and Prithwish,
Thanks for your nice comments. I have implemented them all in the new version: https://drupal.star.bnl.gov/STAR/system/files/dnp21_slides_ashik_ver2.pdf
The results are already preliminary. Here are my preliminary plots: https://drupal.star.bnl.gov/STAR/system/files/plots_prelim_request_ashik_icnfp2021.pdf
I showed the same results in the ICNFP21 conference.
Thanks,
Ashik
On Wed, Oct 6, 2021 at 12:40 AM ShinIchi Esumi via Star-fcv-l <star-fcv-l AT lists.bnl.gov> wrote:
Dear Ashik
I would also like to sign off your nice DNP slides with a few minor comments.
Best regards, ShinIchi
(1) All the data have already been preliminary for sometime and unchanged, right?
(2) It’s good to have your spectator cartoon as a background in page 7. By the way, your
spectator direction is opposite to the usual +v1 in +eta definition…
(3) You are only showing delta_q values on page 16, so please also show delta_S values as well.
(4) Please prepare a set of preliminary plots in one page so that we can include in the DB.
> On Oct 6, 2021, at 11:39, Prithwish Tribedy via Star-fcv-l <star-fcv-l AT lists.bnl.gov> wrote:
>
> Hi Ashik,
> Nice slides:
> https://drupal.star.bnl.gov/STAR/system/files/dnp21_slides_ashik_ver1.pdf
>
> Please reduce the number of introduction slides. Try to combine the slides from #2 to #8 into one or two slides.
>
> Please put the "STAR logo" on each slide.
>
> Minor comment: update the footer on each slide to "You Name, STAR collab., DNP 2021"
>
> On the summary slide, it would be great to add a bullet on the prospects of BES-II measurements with high statistics data on 7.7-19.6 GeV.
>
> It seems the content of your talk is from your previous public presentation:
> https://drupal.star.bnl.gov/STAR/system/files/icnfp21_slides_ashik_ver5_0.pdf
>
> I sign off your talk with the inclusion of aforementioned minor comments.
>
> Best,
> Prithwish
>
>
> On 2021-10-02 16:19, webmaster--- via Star-fcv-l wrote:
>> Dear star-fcv-l AT lists.bnl.gov members,
>> Ashik Ikbal Sheikh (ashikhep AT gmail.com) has submitted a material for a
>> review, please have a look:
>> https://drupal.star.bnl.gov/STAR/node/56649
>> ---
>> If you have any problems with the review process, please contact
>> webmaster AT www.star.bnl.gov
>> _______________________________________________
>> Star-fcv-l mailing list
>> Star-fcv-l AT lists.bnl.gov
>> https://lists.bnl.gov/mailman/listinfo/star-fcv-l
> _______________________________________________
> Star-fcv-l mailing list
> Star-fcv-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/star-fcv-l
_______________________________________________
Star-fcv-l mailing list
Star-fcv-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fcv-l
Ashik Ikbal
Research Associate
Kent State University
Department Of Physics
Kent, OH 44242, USA
Contact no.s: +1 631-504-7647 (USA)
+91 8250216234 (India)
Alternate e-mails: asheikh2 AT kent.edu
-
[Star-fcv-l] STAR presentation by Ashik Ikbal Sheikh for DNP 2021 submitted for review,
webmaster, 10/02/2021
-
Re: [Star-fcv-l] STAR presentation by Ashik Ikbal Sheikh for DNP 2021 submitted for review,
Prithwish Tribedy, 10/05/2021
-
Re: [Star-fcv-l] STAR presentation by Ashik Ikbal Sheikh for DNP 2021 submitted for review,
ShinIchi Esumi, 10/06/2021
- Re: [Star-fcv-l] STAR presentation by Ashik Ikbal Sheikh for DNP 2021 submitted for review, ASHIK IKBAL, 10/06/2021
-
Re: [Star-fcv-l] STAR presentation by Ashik Ikbal Sheikh for DNP 2021 submitted for review,
ShinIchi Esumi, 10/06/2021
-
Re: [Star-fcv-l] STAR presentation by Ashik Ikbal Sheikh for DNP 2021 submitted for review,
Jiangyong Jia, 10/29/2021
- Re: [Star-fcv-l] STAR presentation by Ashik Ikbal Sheikh for DNP 2021 submitted for review, ASHIK IKBAL, 10/29/2021
-
Re: [Star-fcv-l] STAR presentation by Ashik Ikbal Sheikh for DNP 2021 submitted for review,
Prithwish Tribedy, 10/05/2021
Archive powered by MHonArc 2.6.24.