star-fcv-l AT lists.bnl.gov
Subject: STAR Flow, Chirality and Vorticity PWG
List archive
Re: [Star-fcv-l] FCV meeting for QM poster approval on March 30 Wednesday 11.30 am EST
- From: subhash <subhash AT rcf.rhic.bnl.gov>
- To: Cameron Racz <cracz001 AT ucr.edu>
- Cc: "STAR Flow, Chirality and Vorticity PWG" <star-fcv-l AT lists.bnl.gov>
- Subject: Re: [Star-fcv-l] FCV meeting for QM poster approval on March 30 Wednesday 11.30 am EST
- Date: Fri, 01 Apr 2022 10:45:39 +0800
Dear Cameron,
Ok, I want to understand whether or not the Barlow test you are performing can underestimate (overestimate) the errors in your central (peripheral) bins.
What I mean here is for example if you have apply tighter vz selection for your systematic variation, the data sample of tighter vz sample is a sub-sample of your default vz case. As per my understanding, you should perform Barlow test for such kind of cases where statistical samples are different. I think nhits cuts etc could fall in that category. But I think the variation of eta-sub events (which is a reference plane) should not be included in Barlow rejection test. What do you think?
Thanks and regards,
Subhash
On 2022-04-01 10:27 AM, Cameron Racz wrote:
Hi Subhash,
Yes for every cut in that presentation you linked I ran the full
analysis with a higher setting and a lower setting, separately. I also
only ran with one variation at a time. I then performed the Barlow
check for every cut. For the vz cut, for example, I look at the
average Delta/sigma_Delta (from that presentation) that includes the
results from the higher and lower vz cut. So for each cut, that
average includes both the high and low settings, and is averaged over
all bins of v3 plots (most of which are not being shown in the
presentation).
I’m not totally sure if this answers your last statement about
needing a sub-sample, but hopefully it clarifies things. I’m
interested to know what you mean by “sub-sample of the default cut
settings” if you could explain that a little more.
Thanks,
Cameron Racz
Ph.D. Candidate
Heavy-ion Physics Group
University of California, Riverside
On Mar 31, 2022, at 10:02 PM, subhash <subhash AT rcf.rhic.bnl.gov>(https://drupal.star.bnl.gov/STAR/system/files/CRacz_3GeV_prelimUpdate.pdf).
wrote:
Dear Cameron,
Thanks for considering our suggestion.
Actually the sudden jump of systematics for peripheral bins catches
the eye. I have a follow up question on the estimation of the
systematic uncertainty. I see you did a Barlow check and assigned
systematics if it passed the check.
Do you perform this check for all the analysis cuts variation? It ishttps://drupal.star.bnl.gov/STAR/presentations/Quark-Matter-2022/Event-Plane-Correlated-Triangular-Flow-sqrtsNN-30-GeV-AuAu-Collision
not clear from your slides. This check should only be performed, if
the statistical sample of systematic variation is a sub-sample of
the default cut settings (e.g. loose and stricter vz cut). Can you
please clarify on this.
Thanks and regards,
Subhash
On 2022-04-01 07:50 AM, Cameron Racz wrote:
Hello all,
Thank you for the comments on my poster. I’ve incorporated the
changes suggested from the google doc and meeting and the new poster
slides (version 2) can be found here
For the questions on the systematics for v3 vs rapidity withhttps://stonybrook.zoom.us/rec/share/z5eTtFZ4yD0JriCV-UiEYviMAEJnop-IK2H_VZVHAvS71p0INvxNrxG78fS3Y97k.n0XnfapgIXnBPxh7
symmetry
across mid-rapidity (center of slide 4), the 0-10% centrality and
10-40% centrality points do have systematic errors but they are too
small to show up on the plot. We considered the suggestions to
estimate larger systematic uncertainties for 10-40% with linear fits
but we did not see a statistically legitimate way to do that. The
current plan will be to pursue a more detailed study of systematics
after Quark Matter.
I did however include these fits in estimating the uncertainty in my
measurement of the slope dv3/dy. I used fits on either side of
mid-rapidity to estimate the slopes, and found those two values had
a
percent difference of about 20%. Since my measurement was dv3/dy
=-0.025, my 20% estimate of the uncertainty is +-0.005 and this has
been put in the summary slide 5.
Cameron Racz
Ph.D. Candidate
Heavy-ion Physics Group
University of California, Riverside
On Mar 30, 2022, at 9:08 PM, subhash via Star-fcv-l
<star-fcv-l AT lists.bnl.gov> wrote:
Dear All,
Thanks everyone for joining the discussion.
This a important reminder, please consider all the suggestions you
received during the meeting, update your slides/posters/figures in
the Drupal, go through the google doc and consider comments
whichever is applicable, send the homework slides/comparisons to
this email thread as early as possible. Here is the link to the
recordings of our meeting and also posted in the meeting page.
Recording:
[1]https://docs.google.com/document/d/1XgLXQW1zIqp5qTr8n9xoesOOlmHmu1a9zUvkXVPQ7II/edit?usp=sharing
[1]
google doc:
[2]https://docs.google.com/document/d/1XgLXQW1zIqp5qTr8n9xoesOOlmHmu1a9zUvkXVPQ7II/edit?usp=sharing
[2]
Thanks and regards,
Jiangyong, Prithwish and Subhash
On 2022-03-30 06:06 PM, subhash wrote:
Dear All,
This is a gentle reminder about today's FCV meeting for QM poster
approval at 11.30 am EST. The agenda is here:
https://drupal.star.bnl.gov/STAR/blog/jjiastar/bulkcorr
You can post your comments/suggestions/edits to each poster here:
[2]https://stonybrook.zoom.us/j/95735410810?pwd=M2JRZDBDSng4MG5SYmx6dlppYXhLZz09
[2]
Thanks and regards,
Jiangyong, Prithwish and Subhash
On 2022-03-29 10:37 AM, subhash wrote:
Dear All,
We will have a special FCV meeting on March 30 Wednesday starting
11.30 am EST (NY time) to go through the QM posters from FCV group.
We
will have 5 minute for each poster + discussions, if needed. We
suggest you to make 5 slides for your presentation that we can go
through. We will collect cosmetic comments in a google doc, will be
shared during the meeting. We request you, especially senior FCV
members, to join this meeting. Here is the tentative agenda.
Kosuke,
Takafumi,
Xingrui,
Diyu,
Li-ke,
Zuowen,
Edwin,
Priyanshi,
Rishabh,
Prabhupada,
Jagbir,
Xiaoyu,
Ding,
Cameron,
Chunjian,
Yicheng,
Jiangyong
We will use our regular zoom room.
[3]https://urldefense.com/v3/__https://stonybrook.zoom.us/rec/share/z5eTtFZ4yD0JriCV-UiEYviMAEJnop-IK2H_VZVHAvS71p0INvxNrxG78fS3Y97k.n0XnfapgIXnBPxh7__;!!P4SdNyxKAPE!S4vfJBvfSdbJvy1bKseaLwsiSZXoTJuFBS_RsYhcQUgftQAxGwIzH0NxonjkK3FRd-kP7qg$
[3]
Meeting ID: 957 3541 0810
Passcode: 486227
Thanks and regards,
Jiangyong, Prithwish and Subhash
_______________________________________________
Star-fcv-l mailing list
Star-fcv-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fcv-l
Links:
------
[1]
[2]https://urldefense.com/v3/__https://docs.google.com/document/d/1XgLXQW1zIqp5qTr8n9xoesOOlmHmu1a9zUvkXVPQ7II/edit?usp=sharing__;!!P4SdNyxKAPE!S4vfJBvfSdbJvy1bKseaLwsiSZXoTJuFBS_RsYhcQUgftQAxGwIzH0NxonjkK3FR-RNAUeE$
[3]https://urldefense.com/v3/__https://stonybrook.zoom.us/j/95735410810?pwd=M2JRZDBDSng4MG5SYmx6dlppYXhLZz09__;!!P4SdNyxKAPE!S4vfJBvfSdbJvy1bKseaLwsiSZXoTJuFBS_RsYhcQUgftQAxGwIzH0NxonjkK3FRaHqZ834$
Links:
------
[1] https://urldefense.com/v3/__https://stonybrook.zoom.us/rec/share/z5eTtFZ4yD0JriCV-UiEYviMAEJnop-IK2H_VZVHAvS71p0INvxNrxG78fS3Y97k.n0XnfapgIXnBPxh7__;!!P4SdNyxKAPE!T606Y0QsYS0ijrg68ld9yElCstOSWe4CJ3bE9BtmzYDpbKegd5ayu2H6IZ7W9rgW2mdlRBI$
[2] https://urldefense.com/v3/__https://docs.google.com/document/d/1XgLXQW1zIqp5qTr8n9xoesOOlmHmu1a9zUvkXVPQ7II/edit?usp=sharing__;!!P4SdNyxKAPE!T606Y0QsYS0ijrg68ld9yElCstOSWe4CJ3bE9BtmzYDpbKegd5ayu2H6IZ7W9rgWNsyr-pI$
[3] https://urldefense.com/v3/__https://stonybrook.zoom.us/j/95735410810?pwd=M2JRZDBDSng4MG5SYmx6dlppYXhLZz09__;!!P4SdNyxKAPE!T606Y0QsYS0ijrg68ld9yElCstOSWe4CJ3bE9BtmzYDpbKegd5ayu2H6IZ7W9rgWQxlZR7g$
-
Re: [Star-fcv-l] FCV meeting for QM poster approval on March 30 Wednesday 11.30 am EST
, (continued)
-
Re: [Star-fcv-l] FCV meeting for QM poster approval on March 30 Wednesday 11.30 am EST,
Yicheng Feng, 03/30/2022
- Re: [Star-fcv-l] FCV meeting for QM poster approval on March 30 Wednesday 11.30 am EST, Wang, Fuqiang, 03/30/2022
-
Re: [Star-fcv-l] FCV meeting for QM poster approval on March 30 Wednesday 11.30 am EST,
subhash, 03/30/2022
- Re: [Star-fcv-l] FCV meeting for QM poster approval on March 30 Wednesday 11.30 am EST, Chunjian Zhang, 03/30/2022
- Re: [Star-fcv-l] FCV meeting for QM poster approval on March 30 Wednesday 11.30 am EST, kokubo, 03/31/2022
- Re: [Star-fcv-l] FCV meeting for QM poster approval on March 30 Wednesday 11.30 am EST, jagbir, 03/31/2022
-
Re: [Star-fcv-l] FCV meeting for QM poster approval on March 30 Wednesday 11.30 am EST,
Cameron Racz, 03/31/2022
-
Re: [Star-fcv-l] FCV meeting for QM poster approval on March 30 Wednesday 11.30 am EST,
subhash, 03/31/2022
-
Re: [Star-fcv-l] FCV meeting for QM poster approval on March 30 Wednesday 11.30 am EST,
Cameron Racz, 03/31/2022
- Re: [Star-fcv-l] FCV meeting for QM poster approval on March 30 Wednesday 11.30 am EST, subhash, 03/31/2022
- Re: [Star-fcv-l] FCV meeting for QM poster approval on March 30 Wednesday 11.30 am EST, Cameron Racz, 03/31/2022
-
Re: [Star-fcv-l] FCV meeting for QM poster approval on March 30 Wednesday 11.30 am EST,
Cameron Racz, 03/31/2022
-
Re: [Star-fcv-l] FCV meeting for QM poster approval on March 30 Wednesday 11.30 am EST,
subhash, 03/31/2022
- Re: [Star-fcv-l] FCV meeting for QM poster approval on March 30 Wednesday 11.30 am EST, subhash, 03/31/2022
-
Re: [Star-fcv-l] FCV meeting for QM poster approval on March 30 Wednesday 11.30 am EST,
Yicheng Feng, 03/30/2022
Archive powered by MHonArc 2.6.24.