star-fcv-l AT lists.bnl.gov
Subject: STAR Flow, Chirality and Vorticity PWG
List archive
Re: [Star-fcv-l] Request for PWGC preview for our isobar background baseline study
- From: Jiangyong Jia <jiangyong.jia AT stonybrook.edu>
- To: star-fcv-l AT lists.bnl.gov
- Subject: Re: [Star-fcv-l] Request for PWGC preview for our isobar background baseline study
- Date: Fri, 17 Feb 2023 13:59:02 -0500
Dear Yicheng,
Could I ask what do you mean by true
flow In slide 13 of the backup in the following PWGC talk? There
are different method of estimate for flow, I do not see one can
tell which one is true which one is not. The fact that standard
and two-subevent method give you the same ratio, suggest non-flow
only comes in as a small dilution effect and can not change the
isobar ratio a lot.
My point is that different methods
extract different flow signal due to significant flow
decorrelation effects in medium size system, so it is not very
surprising one get somewhat different answer. But I caution that
you extensive non-flow subtraction method might introduce
additional biases, i.e if the method somehow removes a different
amount of non-flow or even removes some flow signal. Also there
are decorrelation effects which you might introduce method
dependencies. So I disagree with the conclusion of slide 13.
By the way in a recent AMPT study
(2301.01294), we do find flow contains a significant component
delta that is uncorrelated with participant eccentricity in both
RHIC and LHC, which serves to dilute the response to nuclear
deformation effects. However, we do not interpret this component
as non-flow due to its relative mild dependence with Nch, and
instead we argue there is a component of flow that is not captured
by the PP due to subnucleon fluctuations or final state dynamical
effects.
Thanks,
On 1/30/23 11:55 AM, Feng, Yicheng via
Star-fcv-l wrote:
Hi FCV convenors,
We presented a paper proposal in the FCV meeting last week for our isobar background baseline study. As the next step, I'd like to request a PWGC preview for that.
The slides presented last Wednesday can be found through the link below: https://drupal.star.bnl.gov/STAR/system/files/PPRP20230125_v2.pdf
I wonder what else we need to prepare for this preview request.
Please let me know if you have any comments or need any additional information.
Thank you,
Yicheng for the PAs
_______________________________________________ Star-fcv-l mailing list Star-fcv-l AT lists.bnl.gov https://lists.bnl.gov/mailman/listinfo/star-fcv-l
-
Re: [Star-fcv-l] Request for PWGC preview for our isobar background baseline study,
Jiangyong Jia, 02/17/2023
-
Re: [Star-fcv-l] Request for PWGC preview for our isobar background baseline study,
Wang, Fuqiang, 02/17/2023
- Re: [Star-fcv-l] Request for PWGC preview for our isobar background baseline study, Roy Lacey, 02/17/2023
-
Re: [Star-fcv-l] Request for PWGC preview for our isobar background baseline study,
Wang, Fuqiang, 02/17/2023
Archive powered by MHonArc 2.6.24.