star-fcv-l AT lists.bnl.gov
Subject: STAR Flow, Chirality and Vorticity PWG
List archive
Re: [Star-fcv-l] FCV PWG meeting on 19/June/2024 Wed. 9:30 AM EDT
- From: Gaoguo Yan <gyan AT rcf.rhic.bnl.gov>
- To: "STAR Flow, Chirality and Vorticity PWG" <star-fcv-l AT lists.bnl.gov>
- Subject: Re: [Star-fcv-l] FCV PWG meeting on 19/June/2024 Wed. 9:30 AM EDT
- Date: Sat, 22 Jun 2024 11:40:50 +0800
Dear conveners,
I have presented paper proposal: Collision energy and system size dependence of longitudinal flow de-correlation at RHIC at PWG-FCV meeting. Below are responses to the PWG review.
Q1: Can you extract fit parameter?
A1: In our measurement, we used linear function to fit r_n versus eta. I extracted parameter F_n(n=2,3) with centrality function in Au+Au collisions at 19.6, 27, 54.4 and 200 GeV as well as isobar collisions at 200 GeV. Though fitting the data points which only include systematic uncertainty, I see the fitting error as systematic uncertainty of F_n. You can find the in attachment.
Q2: What is the physical source of longitudinal flow de-correlation?
A2: Two sources: v_n asymmetry and event plane twist. Our observable r_n can’t distinguish them. However, due to ATLAS has larger acceptance and statistics, they defined a new observable, R_n that is sensitive to the event plane twist effects. Though r_n and R_n, they evaluate this two contributions. You can find more detail by this reference: Eur. Phys. J. C 78 (2018) 2, 142. We have measured the R_n in isobar but it has large uncertainty. You can find PWG-FCV meeting link as below:
https://drupal.star.bnl.gov/STAR/system/files/20211110_isobar_FCV.pdf
Q3: What model results are available now?
A3: In RHIC energy, there is MC-Glauber, UrQMD and AMPT models results. But those models have different pt range and reference eta range and only focus on RHIC top energy. We can’t compare with them, directly. We will discuss with theorist and add results of comparison with model in our final results.
If I have missed any comments, please contact me. In additions, if there are no more comments, I would like to apply for PWGC review. Thanks a lot.
Best regards,
Gaoguo Yan
在 2024-06-19 18:50,Gaoguo Yan via Star-fcv-l 写道:
Dear all,
Please find my slides in today meeting at below link:
https://drupal.star.bnl.gov/STAR/blog/gyan/Paper_proposal_LDeCorr_energy_system
Best regards,
Gaoguo
在 2024-06-17 16:02,Gaoguo Yan via Star-fcv-l 写道:
Dear Conveners,_______________________________________________
I would like to present paper proposal: Collison energy and syetem
size dependence of longitudinal flow de-correlation at RHIC. Please
add me to the agenda. Thanks a lot.
Best regards,
Gaoguo Yan
在 2024-06-17 15:30,subhash via Star-fcv-l 写道:
Dear All,_______________________________________________
We shall have our weekly FCV PWG meeting this Wednesday (19/June/2024)
at 9:30 AM EDT. If you wish to present please let us know. The agenda
will be collected at:
https://drupal.star.bnl.gov/STAR/blog/jjiastar/bulkcorr
Please send us your slides by Tuesday. Zoom details are copied below.
Thanks and regards,
Prithwish, Zhenyu and Subhash
ZOOM LINK FOR FCV MEETING:
Join ZoomGov Meeting
https://bnl.zoomgov.com/j/1612377416?pwd=V3kvcnN5ZTRLVEc4U01QWUUycDQ1UT09
Meeting ID: 161 237 7416
Passcode: 106847
One tap mobile
+16692545252,,1612377416#,,,,*106847# US (San Jose)
+16468287666,,1612377416#,,,,*106847# US (New York)
Dial by your location
+1 669 254 5252 US (San Jose)
+1 646 828 7666 US (New York)
+1 551 285 1373 US
+1 669 216 1590 US (San Jose)
Meeting ID: 161 237 7416
Passcode: 106847
Find your local number: https://bnl.zoomgov.com/u/abVqdu5fbU
Join by SIP
1612377416 AT sip.zoomgov.com
Join by H.323
161.199.138.10 (US West)
161.199.136.10 (US East)
Meeting ID: 161 237 7416
Passcode: 106847
_______________________________________________
Star-fcv-l mailing list
Star-fcv-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fcv-l
Star-fcv-l mailing list
Star-fcv-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fcv-l
Star-fcv-l mailing list
Star-fcv-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fcv-l
Attachment:
Fn_energy.pdf
Description: Adobe PDF document
Attachment:
Fn_system.pdf
Description: Adobe PDF document
-
Re: [Star-fcv-l] FCV PWG meeting on 12/June/2024 Wed. 9:30 AM EDT
, (continued)
- Re: [Star-fcv-l] FCV PWG meeting on 12/June/2024 Wed. 9:30 AM EDT, Jie Zhao, 06/10/2024
- Re: [Star-fcv-l] FCV PWG meeting on 12/June/2024 Wed. 9:30 AM EDT, Shengli Huang, 06/11/2024
-
Re: [Star-fcv-l] FCV PWG meeting on 12/June/2024 Wed. 9:30 AM EDT,
Gaoguo Yan, 06/10/2024
- Re: [Star-fcv-l] FCV PWG meeting on 12/June/2024 Wed. 9:30 AM EDT, Robertson, Charles William, 06/10/2024
- Re: [Star-fcv-l] FCV PWG meeting on 12/June/2024 Wed. 9:30 AM EDT, Achyut Khanal, 06/11/2024
- Re: [Star-fcv-l] FCV PWG meeting on 12/June/2024 Wed. 9:30 AM EDT, Guoping, 06/12/2024
-
[Star-fcv-l] FCV PWG meeting on 19/June/2024 Wed. 9:30 AM EDT,
subhash, 06/17/2024
- Re: [Star-fcv-l] FCV PWG meeting on 19/June/2024 Wed. 9:30 AM EDT, pdixit, 06/17/2024
-
Re: [Star-fcv-l] FCV PWG meeting on 19/June/2024 Wed. 9:30 AM EDT,
Gaoguo Yan, 06/17/2024
-
Re: [Star-fcv-l] FCV PWG meeting on 19/June/2024 Wed. 9:30 AM EDT,
Gaoguo Yan, 06/19/2024
- Re: [Star-fcv-l] FCV PWG meeting on 19/June/2024 Wed. 9:30 AM EDT, Gaoguo Yan, 06/21/2024
-
Re: [Star-fcv-l] FCV PWG meeting on 19/June/2024 Wed. 9:30 AM EDT,
Gaoguo Yan, 06/19/2024
-
Re: [Star-fcv-l] FCV PWG meeting on 19/June/2024 Wed. 9:30 AM EDT,
Shengli Huang, 06/17/2024
-
Re: [Star-fcv-l] FCV PWG meeting on 19/June/2024 Wed. 9:30 AM EDT,
Shengli Huang, 06/18/2024
- Re: [Star-fcv-l] FCV PWG meeting on 19/June/2024 Wed. 9:30 AM EDT, pdixit, 06/19/2024
-
Re: [Star-fcv-l] FCV PWG meeting on 19/June/2024 Wed. 9:30 AM EDT,
Shengli Huang, 06/18/2024
-
[Star-fcv-l] 回覆: FCV PWG meeting on 19/June/2024 Wed. 9:30 AM EDT,
Han-sheng Li, 06/18/2024
-
[Star-fcv-l] 回覆: FCV PWG meeting on 19/June/2024 Wed. 9:30 AM EDT,
Han-sheng Li, 06/19/2024
-
Re: [Star-fcv-l] 回覆: FCV PWG meeting on 19/June/2024 Wed. 9:30 AM EDT,
Gang Wang, 06/19/2024
-
[Star-fcv-l] 回覆: 回覆: FCV PWG meeting on 19/June/2024 Wed. 9:30 AM EDT,
Han-sheng Li, 06/19/2024
-
Re: [Star-fcv-l] 回覆: 回覆: FCV PWG meeting on 19/June/2024 Wed. 9:30 AM EDT,
Huan Huang, 06/19/2024
- [Star-fcv-l] 回覆: 回覆: 回覆: FCV PWG meeting on 19/June/2024 Wed. 9:30 AM EDT, Han-sheng Li, 06/21/2024
- Re: [Star-fcv-l] 回覆: 回覆: FCV PWG meeting on 19/June/2024 Wed. 9:30 AM EDT, Huan Huang, 06/21/2024
-
Re: [Star-fcv-l] 回覆: 回覆: FCV PWG meeting on 19/June/2024 Wed. 9:30 AM EDT,
Huan Huang, 06/19/2024
-
[Star-fcv-l] 回覆: 回覆: FCV PWG meeting on 19/June/2024 Wed. 9:30 AM EDT,
Han-sheng Li, 06/19/2024
-
Re: [Star-fcv-l] 回覆: FCV PWG meeting on 19/June/2024 Wed. 9:30 AM EDT,
Gang Wang, 06/19/2024
-
[Star-fcv-l] 回覆: FCV PWG meeting on 19/June/2024 Wed. 9:30 AM EDT,
Han-sheng Li, 06/19/2024
Archive powered by MHonArc 2.6.24.