Skip to Content.
Sympa Menu

star-fst-l - Re: [Star-fst-l] New T-board and Hybrid have arrived SDU

star-fst-l AT lists.bnl.gov

Subject: Star-fst-l mailing list

List archive

Chronological Thread  
  • From: Zhenyu Ye <yezhenyu2003 AT gmail.com>
  • To: "Capotosto, Michael" <capotosto AT bnl.gov>
  • Cc: "star-fst-l AT lists.bnl.gov" <star-fst-l AT lists.bnl.gov>
  • Subject: Re: [Star-fst-l] New T-board and Hybrid have arrived SDU
  • Date: Wed, 14 Aug 2019 11:15:30 -0500

Hi Mike, I think SDU will need to keep one T-board for future reference. For
BNL, you will receive 8 bare T-boards, but only need to use 6 of them to
connect to prototype cables you have, and keep the other 2 for possible
future usage. I do not need parts for T-board assembly from you, neither does
NCKU I believe. We can discuss this tomorrow.

Zhenyu

P.S. as you saw from Jianing’s email, she is expecting to get connectors for
your T-boards on Sept. 13, and will send them to you for the 6 T-board
assembly.

> On Aug 14, 2019, at 10:48 AM, Capotosto, Michael <capotosto AT bnl.gov> wrote:
>
> All,
>
> These numbers don't add up to me - if we have a total of 12 boards, 10 to
> BNL, 2 to Yi, and 1 to Zhenyu. Additionally, we only have prototype cables
> for 6 T-Boards, so we should only need 6 bare boards, unless you'd like us
> to assemble spares with no cables.
>
>
> Zhenyu, Yi, if you are receiving bare T-Boards will you require us to send
> parts to you, or will you be sourcing your own?
>
> --Mike
>
> -----Original Message-----
> From: Star-fst-l <star-fst-l-bounces AT lists.bnl.gov> On Behalf Of
> qianyang_sdu AT sdu.edu.cn
> Sent: Tuesday, August 13, 2019 10:49 PM
> To: star-fst-l AT lists.bnl.gov
> Subject: Re: [Star-fst-l] New T-board and Hybrid have arrived SDU
>
> Hi All
> After a short discuss with Zhenyu, I will send 8 T-boards to Mike, 10 sets
> of hybrids and 2 T-boards to Yi, and 1 set of hybrids and 1 T-board to
> Zhenyu. Mike and Yi, Are you agree with these numbers?
> Can you also send me the shipping address?
>
> Qian Yang
>
>> -----Original Messages-----
>> From: "Qian Yang" <qianyang_sdu AT sdu.edu.cn> Sent Time: 2019-08-14
>> 10:29:09 (Wednesday)
>> To: star-fst-l AT lists.bnl.gov
>> Cc:
>> Subject: [Star-fst-l] New T-board and Hybrid have arrived SDU
>>
>> Hi Zhenyu and Yi,
>>
>> We received the newest redesigned (version: v2.1) T-board and Hybrid from
>> manufacturer. We ordered 12 sets, each set contains one inner hybrid, one
>> outer hybrid and one T-board.
>> As we will not have the connector until middle of September, Do you want
>> us sent T-board and Hybrid to you now? Or waiting for the connector?
>> Please also tell me how many sets do you want?
>>
>> Please find the picture of T-baord and Hybrid in the link:
>> https://drupal.star.bnl.gov/STAR/blog/tc88qy/forward-tracking-system-s
>> ilicon
>>
>> Qian Yang
>>
>>
>> _______________________________________________
>> Star-fst-l mailing list
>> Star-fst-l AT lists.bnl.gov
>> https://lists.bnl.gov/mailman/listinfo/star-fst-l
> _______________________________________________
> Star-fst-l mailing list
> Star-fst-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/star-fst-l
> _______________________________________________
> Star-fst-l mailing list
> Star-fst-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/star-fst-l





Archive powered by MHonArc 2.6.24.

Top of Page