star-fst-l AT lists.bnl.gov
Subject: Star-fst-l mailing list
List archive
[Star-fst-l] Electrical test of hybrid after component mounting
- From: "Ye, Zhenyu" <yezhenyu AT uic.edu>
- To: 董家宁 <jndong AT sdu.edu.cn>
- Cc: "star-fst-l AT lists.bnl.gov" <star-fst-l AT lists.bnl.gov>
- Subject: [Star-fst-l] Electrical test of hybrid after component mounting
- Date: Sat, 28 Mar 2020 13:43:31 +0000
Hi Jianing,
As discussed at this week’s meeting, NCKU will conduct electrical test of
hybrid after component mounting. I am thinking of checking for the following
1. shortage between the neighboring pins (in both x and y directions) on the
hybrid connector
2. open connection between the hybrid connector pins and the corresponding
components or pads on the hybrid
which can be done by a student in the lab using a DMM. What do you think? If
you agree, can you please define which pins/components/pads to check?
Thanks,
Zhenyu
-
[Star-fst-l] Electrical test of hybrid after component mounting,
Ye, Zhenyu, 03/28/2020
- Re: [Star-fst-l] Electrical test of hybrid after component mounting, 董家宁, 03/29/2020
Archive powered by MHonArc 2.6.24.