Skip to Content.
Sympa Menu

star-fst-l - [Star-fst-l] Electrical test of hybrid after component mounting

star-fst-l AT lists.bnl.gov

Subject: Star-fst-l mailing list

List archive

Chronological Thread  
  • From: "Ye, Zhenyu" <yezhenyu AT uic.edu>
  • To: 董家宁 <jndong AT sdu.edu.cn>
  • Cc: "star-fst-l AT lists.bnl.gov" <star-fst-l AT lists.bnl.gov>
  • Subject: [Star-fst-l] Electrical test of hybrid after component mounting
  • Date: Sat, 28 Mar 2020 13:43:31 +0000

Hi Jianing,

As discussed at this week’s meeting, NCKU will conduct electrical test of
hybrid after component mounting. I am thinking of checking for the following

1. shortage between the neighboring pins (in both x and y directions) on the
hybrid connector
2. open connection between the hybrid connector pins and the corresponding
components or pads on the hybrid

which can be done by a student in the lab using a DMM. What do you think? If
you agree, can you please define which pins/components/pads to check?

Thanks,
Zhenyu


Archive powered by MHonArc 2.6.24.

Top of Page