star-fst-l AT lists.bnl.gov
Subject: Star-fst-l mailing list
List archive
Re: [Star-fst-l] Weekly FST meeting, September 14 8:30am (BNL time)
- From: "Ye, Zhenyu" <yezhenyu AT uic.edu>
- To: "Ye, Zhenyu" <yezhenyu AT uic.edu>
- Cc: Star-fst L <star-fst-l AT lists.bnl.gov>
- Subject: Re: [Star-fst-l] Weekly FST meeting, September 14 8:30am (BNL time)
- Date: Sat, 19 Sep 2020 03:43:17 +0000
Minutes
Cooling system: New pump, and control unit installed, running for 4 hours w/o
trips
Integration: Felix sent Rahul all the drawings last Friday. Rahul will review
the drawings, and move to tolerance-type analysis. Will send the drawings to
machine shop before finishing tolerance-type analysis.
Received inner ring from Yi Wednesday afternoon, the quality looks bad, can
open up the holes, may work for us,
-> Increase the width by half an mm on both sides, may add washer if needed.
Felix will update the drawings
Mechanical structure:
Thermal grease: radiation damage test finished today, results look ok. Will
report next week
Thermal camera to check hybrid gluing: still trying
Hybrid and T-board
10 sets in 2 weeks, 50 sets in 3-4 weeks
T-board modifications look ok, Gerard will take a look at the layout
Add T-board test-fit in MS production procedure
Gerard plans to visit UIC possibly in the later portion of next week, plan to
stay for two days to investigate the noise
BNL test stand: pedestal without HV, should including it in the STAR
plan/request
DAQ integration test: agreed on the dates, beginning from Nov 30th
> On Sep 11, 2020, at 8:43 AM, Ye, Zhenyu <yezhenyu AT uic.edu> wrote:
>
> Dear all,
>
> We will have the Weekly FST meeting on Monday starting at 8:30am EST (BNL
> local time).
>
> Bluejeans Meeting URL https://bluejeans.com/101020434
> Meeting ID: 101 020 434
>
> https://drupal.star.bnl.gov/STAR/event/2020/09/14/star-forward-silicon-tracker-meeting
>
> 0. follow-ups on review and action items *
> 1. DAQ integration test with prototype module at BNL
> 2. Integration
> by Rahul Sharma, Felix Archampong
> 3. Hybrid and T-board
> by Maowu Nie, Jianing Dong
> 4. Patch panel boards and ABC boards by Mike
> Capotosto, Gerard Visser
> 5. Mechanical structure by
> Yi Yang
>
> *
> https://drupal.star.bnl.gov/STAR/event/2020/09/14/star-forward-silicon-tracker-meeting/follow-action-items
>
> Zhenyu
> _______________________________________________
> Star-fst-l mailing list
> Star-fst-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/star-fst-l
-
[Star-fst-l] Weekly FST meeting, September 14 8:30am (BNL time),
Ye, Zhenyu, 09/11/2020
- Re: [Star-fst-l] Weekly FST meeting, September 14 8:30am (BNL time), Ye, Zhenyu, 09/18/2020
Archive powered by MHonArc 2.6.24.