Minutes
Integration - Rahul
cooling level 43%->35% two weeks, reasonable
will send to machine shop after checking Felix’s drawings,
Felix will send more picture on cable strain-relief, and check the clearance
of FST to the beam pipe
Will not increase the width of the 3D-printed inner ring, but increase the
size of the hole on the ring
Mechanical structure - Yi
Received 200 sets of MS from EASTON, measured one set randomly picked,
flatness look reasonable, inner/outer parts are ~300 microns longer, so in
total 600-700 microns longer for the whole module. Possible consequence:
reduced clearance to the beam pipe (how much? Felix will check), fit with
integration inner ring (Yi, can remake the ring if necessary)
Received 55 cooling tubes from AIDC. Still 35 more to come
Radiation test of thermal grease shows no degrading
Hybrid - Maowu
Received and QC'ed 10 sets inner/outer hybrids. Saw one bump on the inner
hybrid but no problem with QC test -> send to NCKU
70 more outer hybrids produced by vendor.
Need to remake the 70 inner hybrids, 3-4 weeks -> Maowu will check if partial
delivery is possible
T-board - Maowu
Produce 10 boards now -> BNL received 97 T-board connectors and Mike will
send them to SDU
Wait for Gerard’s sign off to make the rest
Production module assembly
storage boxes: 3 weeks for prototype, 12 per week for production
tooling: UIC machine shop
Laser test stand: seeing the signals from FST, will take some data this week
BNL test stand: Prithwish/Yu can come three days a week.
DAQ integration test
Plan on starting the test in the week after Thanksgiving.
Xu plans on coming to BNL on Nov 16
> On Sep 27, 2020, at 3:23 PM, Ye, Zhenyu <yezhenyu AT uic.edu> wrote:
>
> Dear all,
>
> We will have the Weekly FST meeting on Monday starting at 8:30am EST (BNL
> local time).
>
> Bluejeans Meeting URL https://bluejeans.com/101020434
> Meeting ID: 101 020 434
>
> https://drupal.star.bnl.gov/STAR/event/2020/09/28/star-forward-silicon-tracker-meeting
>
> 0. follow-ups on review and action items *
> 1. Integration
> by Rahul Sharma, Felix Archampong
> 2. Hybrid and T-board
> by Maowu Nie
> 3. Mechanical structure by
> Yi Yang
> 4. Production module assembly by Xu Sun
>
> *
> https://drupal.star.bnl.gov/STAR/event/2020/09/28/star-forward-silicon-tracker-meeting/follow-action-items
>
> Zhenyu
> _______________________________________________
> Star-fst-l mailing list
> Star-fst-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/star-fst-l
-
[Star-fst-l] Weekly FST meeting, September 28 8:30am (BNL time),
Ye, Zhenyu, 09/27/2020
- Re: [Star-fst-l] Weekly FST meeting, September 28 8:30am (BNL time), Ye, Zhenyu, 09/28/2020
Archive powered by MHonArc 2.6.24.