Minutes
Integration - Felix
In the second iteration of finalizing the drawings.
Checked the clearance between beam pipe and central brace (0.3 inch)
Will discuss with Rahul whether it is still possible to do the test
installation of supporting structure in January.
Mechanical Structure - Yi
Finished measuring all 200 sets of MS, will select the best 60
Received 10 sets of hybrids with connectors mounted, open/short tested two.
Will send them to TiDC to make the first two sets of MS this week.
Hybrids and T-boards - Maowu
Received 70 inner hybrids today, will begin the test, and send the 70 sets of
hybrids to Yi this week.
10 T-boards ordered last week. It will take 3-4 weeks to produce and 1-2
weeks to mount the components and open/short test
Module Assembly - Zhenyu
Working on cosmic ray test stand to check prototype modules after
encapsulation by Gavin
Working on laser test stand data taking and analysis by Andres
New assembly tooling and storage box in progress
Test stand at BNL - Yu
Get the test stand working again. Will turn on HV and check the pedestals.
> On Oct 16, 2020, at 7:47 PM, Ye, Zhenyu <yezhenyu AT uic.edu> wrote:
>
> Dear all,
>
> We will have the Weekly FST meeting on Monday starting at 8:30am EST (BNL
> local time).
>
> https://drupal.star.bnl.gov/STAR/event/2020/10/19/star-forward-silicon-tracker-meeting
>
> 0. follow-ups on review and action items *
> 1. Integration
> by Rahul Sharma, Felix Archampong
> 2. Hybrid and T-board
> by Maowu Nie, Jianing Dong
> 3. Mechanical structure by
> Yi Yang
> 4. Production module assembly by Xu Sun
> 5. Safety Review
> by Zhenyu Ye
>
> *
> https://drupal.star.bnl.gov/STAR/event/2020/10/19/star-forward-silicon-tracker-meeting/follow-action-items
>
> Zhenyu
>
> ********** ZOOM Meeting ********** **********
> https://urldefense.com/v3/__https://zoom.us/j/87904302955__;!!P4SdNyxKAPE!S97k8aZyseacUSLh8nz7yJzCBL6ogRcd-PP0Ia7MtOpqx8J2oz63F8La0U7aKt5UhU9gjcU$
>
> ID: 879 0430 2955
> Passcode: fSTAR2021
> ********** ********** ********** ********** *******
> _______________________________________________
> Star-fst-l mailing list
> Star-fst-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/star-fst-l
-
[Star-fst-l] Weekly FST meeting, Oct 19 8:30am (BNL time),
Ye, Zhenyu, 10/16/2020
- Re: [Star-fst-l] Weekly FST meeting, Oct 19 8:30am (BNL time), Ye, Zhenyu, 10/20/2020
Archive powered by MHonArc 2.6.24.