Hi Xu
I l sounds good. Just to complement what else was done at BNL.
On Wednesday Mike (mostly) and I installed two grey cables to run from 3 floor
do to the FST racks. I discussed with Rahul and Bill the dark box, and if Bill was done with the work for Oleg
he would work on the dark box today.

Flemming

On 2020-11-20 15:50, Xu Sun wrote:
Hi all,

We had a very productive first week for the preparation of the FST
integration test.
You could find the updates from the following link:
https://drupal.star.bnl.gov/STAR/blog/ptribedy/fst-testing-bnl

The short summary listed below:
1. The crate can be turned ON/OFF and ramp the HV Up/Down from slow
control (shell scripts for now).
2. Connected the FST04 to the BNL test stand with modified ABC boards
and purple cable.
3. Readout all FST04 channels with no HV applied.
4. Built a temporary dark box and applied 70V high voltage to the
FST04. The noise level looks similar to UIC results.

We will also do a noise HV scan later this week and compare with UIC
results. More details will be presented at next Monday's meeting.

Have a nice weekend!

Best,

Xu
_______________________________________________
Star-fst-l mailing list
Star-fst-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fst-l

--
Flemming Videbaek
senior scientist
videbaek @ bnl.gov
Brookhaven National Lab
Physics Department
Bldg 510D
Upton, NY 11973

phone: 631-344-4106
cell : 631-681-1596




Archive powered by MHonArc 2.6.24.

Top of Page