Hi All,
The bulk of the cable pull is complete. We ran the cables under the floor tiles rather than using the trays, to avoid the badly congested points where the trays meet the magnets. I’ll send a drawing with the details around later today.
The cables still need to be dressed at both ends. Zhenyu, Xu, and Gavin will take care of the connections at the rack, with slack cable going under the floor at the south edge of the platform.
I will dress what I can of the endcap cables. Is it ok to connect the wires to the PPBs, or should we wait until the cooling lines have been installed?