Hi Tonko,
This is the planned work today on FST that might have an interference (?)
In the morning:
connecting cooling water lines to FST patch panel board assemblies, which are
mounted on TPC endcap wheel.
leak test of the main supply and return cooling lines and manifolds for FST.
The latter are mounted on TPC endcap wheel.
survey of the FST cage/rails inside the TPC cone
In the afternoon:
connecting grey cables to patch panel boards, which are mounted on TPC endcap
wheel.
Zhenyu
> On Aug 4, 2021, at 7:17 AM, Tonko Ljubicic <tonko AT bnl.gov> wrote:
>
> Hello,
>
> can I apply power to the TPC FEEs now?
> Can I leave it on during the day?
>
> I'm not sure if I will interfere with FST-related work
> in the West but I would like to check the TPC.
>
> -- Tonko
> _______________________________________________
> Star-fst-l mailing list
> Star-fst-l AT lists.bnl.gov
> https://urldefense.com/v3/__https://nam04.safelinks.protection.outlook.com/?url=https*3A*2F*2Flists.bnl.gov*2Fmailman*2Flistinfo*2Fstar-fst-l&data=04*7C01*7Cyezhenyu*40uic.edu*7C3f70c5ccccfc4040a31008d957397bd3*7Ce202cd477a564baa99e3e3b71a7c77dd*7C0*7C0*7C637636726680173116*7CUnknown*7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0*3D*7C1000&sdata=PNPPoobX5hGqP8aT82GP8w1DFDAq9LCwk0lHosf6Hkw*3D&reserved=0__;JSUlJSUlJSUlJSUlJSUlJSUlJQ!!P4SdNyxKAPE!XdnFg3ObnzBadabrWHQ99GQlQeBldoyH09cX5ycZ1_9d105dw743AS4fL8ZMcBUT3Zc7FOs$
>
-
[Star-fst-l] Power to the TPC FEEs?,
Tonko Ljubicic, 08/04/2021
-
Re: [Star-fst-l] Power to the TPC FEEs?,
Ye, Zhenyu, 08/04/2021
- Re: [Star-fst-l] Power to the TPC FEEs?, Tonko Ljubicic, 08/04/2021
-
Re: [Star-fst-l] Power to the TPC FEEs?,
Ye, Zhenyu, 08/04/2021
Archive powered by MHonArc 2.6.24.