Skip to Content.
Sympa Menu

star-fst-l - [Star-fst-l] FST coolant refilled during access

star-fst-l AT lists.bnl.gov

Subject: Star-fst-l mailing list

List archive

Chronological Thread  
  • From: "Tribedy, Prithwish" <ptribedy AT bnl.gov>
  • To: Star-fst L <star-fst-l AT lists.bnl.gov>
  • Subject: [Star-fst-l] FST coolant refilled during access
  • Date: Wed, 15 May 2024 20:00:38 +0000

Dear All,
   Souvik and I utilized the restricted access to refill the NOVAC coolant and switch the pump (thanks to Bill and Gavin for their assistance). The reservoir level has stabilized at around 80% following the refill, and the chiller temperature is getting settles at around the usual value of 23.3°C.

 FST is ready to resume its normal operations.

Best,
Prithwish


Prithwish Tribedy
Physics Department, Brookhaven National Laboratory
Upton, NY 11973, USA
Phone: 631-344-8904, 631-344-3853
E-mail: ptribedy AT bnl.gov


  • [Star-fst-l] FST coolant refilled during access, Tribedy, Prithwish, 05/15/2024

Archive powered by MHonArc 2.6.24.

Top of Page