star-hp-l AT lists.bnl.gov
Subject: STAR HardProbes PWG
List archive
Re: [Star-hp-l] STAR presentation by Dandan Shen for SPIN 2023 submitted for review
- From: Yi Yang <yiyang AT ncku.edu.tw>
- To: STAR HardProbes PWG <star-hp-l AT lists.bnl.gov>
- Subject: Re: [Star-hp-l] STAR presentation by Dandan Shen for SPIN 2023 submitted for review
- Date: Fri, 22 Sep 2023 22:55:00 -0500
Hi Dandan,
Thanks a lot for the updated version. I don't have any further comments on it.
Cheers,
Yi
+++++++++++++++++++++++++++++++++++++++++++++++++++
Yi Yang, Professor
Department of Physics /
Yi Yang, Professor
Department of Physics /
Director of Science Education Center
National Cheng Kung University
Tainan, 701 Taiwan
E-Mail: yiyang AT ncku.edu.tw
Tel: +886-6-2757575 ext.65237
Fax: +886-6-2747995
Group Web: http://phys.ncku.edu.tw/~yiyang
+++++++++++++++++++++++++++++++++++++++++++++++++++
Tainan, 701 Taiwan
E-Mail: yiyang AT ncku.edu.tw
Tel: +886-6-2757575 ext.65237
Fax: +886-6-2747995
Group Web: http://phys.ncku.edu.tw/~yiyang
+++++++++++++++++++++++++++++++++++++++++++++++++++
On Fri, Sep 22, 2023 at 9:53 PM Dandan via Star-hp-l <star-hp-l AT lists.bnl.gov> wrote:
Hi Yi and Nihar,Thanks for your nice comments.Pleas find the new version in the link: https://drupal.star.bnl.gov/STAR/system/files/spin_v3_0.pdfHi Nihar,slides 12: I don't understand it, there is no I_q I_f etc.slides 18: Value and error of rho_00 at centrality 0-80%: 0.2736 +- 0.015 +- 0.0079 , the significance of this point is equal to 3.5Best,Dandan
发件人:Yi Yang <yiyang0429 AT gmail.com>
发送日期:2023-09-22 23:32:44
收件人:STAR HardProbes PWG <star-hp-l AT lists.bnl.gov>
抄送人:Dandan <shendandan AT mail.sdu.edu.cn>
主题:Re: [Star-hp-l] STAR presentation by Dandan Shen for SPIN 2023 submitted for reviewHi Dandan,Sorry for the delayed reply.I have some minor comments for your consideration.- p6: Feed-down also plays a role --> Feed-down contribution also plays a role (or Feed down also plays a role)b hadron decay --> b-hadron decayis there an extra space in front of "in 200 GeV"?- p7: The box on the right. I understand you quoted directly from the paper, but it will confuse people that "you estimate it" if they don't listen to your talk. I would change it to "theoretical prediction: the J/psi polarization at small pT is xxxx"- p12: consistent --> are consistent- p13: New results is --> New results areconsistent --> are consistent- p15: (Lab frame) --> (lab frame)- p16: "/ 00 < 1/3 at LHC forward rapidity" has different font than others.- p18 - p20: I will comment on the preliminary request. Please change these plots according to the final preliminary results.- p21: global spin alignment: merge the first and second bulletsCheers,YiOn Thu, Sep 21, 2023 at 2:56 PM Dandan via Star-hp-l <star-hp-l AT lists.bnl.gov> wrote:Hi Nihar, Yi and IsaacHere are my slides at the SPIN 2023 conference. This is a new version with an improvement.I would be grateful if you could address it. Because the meeting started on the 25th.
Please find the new version in the link: https://drupal.star.bnl.gov/STAR/system/files/spin_Dandan_v0_QianYang_v2.pdfThanks again!Best,DandanFrom: webmaster--- via Star-hp-l <star-hp-l AT lists.bnl.gov> Date: 2023-09-19 21:45:17 To: Star-hp-l AT lists.bnl.gov Cc: webmaster AT star.bnl.gov Subject: [Star-hp-l] STAR presentation by Dandan Shen for SPIN 2023 submitted for review>Dear Star-hp-l AT lists.bnl.gov members, > >Dandan Shen (shendandan AT mail.sdu.edu.cn) has submitted a material for a >review, please have a look: >https://drupal.star.bnl.gov/STAR/node/65180 > >Deadline: 2023-09-24 >--- >If you have any problems with the review process, please contact >webmaster AT www.star.bnl.gov >_______________________________________________ >Star-hp-l mailing list >Star-hp-l AT lists.bnl.gov >https://lists.bnl.gov/mailman/listinfo/star-hp-l
_______________________________________________
Star-hp-l mailing list
Star-hp-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-hp-l
_______________________________________________
Star-hp-l mailing list
Star-hp-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-hp-l
-
Re: [Star-hp-l] STAR presentation by Dandan Shen for SPIN 2023 submitted for review,
Dandan, 09/22/2023
- Re: [Star-hp-l] STAR presentation by Dandan Shen for SPIN 2023 submitted for review, Nihar Sahoo, 09/22/2023
- Re: [Star-hp-l] STAR presentation by Dandan Shen for SPIN 2023 submitted for review, Yi Yang, 09/22/2023
Archive powered by MHonArc 2.6.24.