Skip to Content.
Sympa Menu

star-qaboard-l - Re: [STAR-QAboard] QA Board Meeting 10/29

star-qaboard-l@lists.bnl.gov

Subject: STAR QA Board

List archive

Chronological Thread  
  • From: 林挺 <tinglin@sdu.edu.cn>
  • To: "star-qaboard-l@lists.bnl.gov" <star-qaboard-l@lists.bnl.gov>
  • Subject: Re: [STAR-QAboard] QA Board Meeting 10/29
  • Date: Sat, 30 Oct 2021 01:45:35 +0800 (GMT+08:00)

Hi all:


A brief minutes for today's meeting:

https://drupal.star.bnl.gov/STAR/event/2021/10/29/qa-board-meeting


1. 19.6 GeV Run-by-Run QA:

Comments:

1). RunID 450 to 500, the jump in eta/phi plot likely due to the RDO problems during this runing period.
2). At the beginning of the run, the beam is not centered, so there is shift in eta;


Things to do:

1). Compare the bad run-list to those points that outside the normal ranges, see if there is plotting issues;

2). Check the RunLog to find out the possible reasons for the bad runs;

3). Check other variables like Q;

4). Change the tolerance from 5sigma to 3sigma, to check the sensitivity of cuts.

Conclusion: 

Need to do some checks, but the run list after this QA is good enough for centrality.


2. Discussion:

1). Centrality group is fine with using DCA, but will also monitor the sDCA. May change DCA to sDCA after having a good understanding of this variable.

2). Yu Hu will update the code in Github.

3) We are 80% of the way through 14.6 GeV production. 14.6 GeV QA will start ASAP after the data production is done.


4) For FXT run QA, need a few changes eg. need to change RefMult to number of primary tracks, shift vr cuts. Each working group should think about the changes on QA.

Best,

Ting




Archive powered by MHonArc 2.6.24.

Top of Page