star-qaboard-l@lists.bnl.gov
Subject: STAR QA Board
List archive
- From: 林挺 <tinglin@sdu.edu.cn>
- To: "star-qaboard-l@lists.bnl.gov" <star-qaboard-l@lists.bnl.gov>
- Subject: Re: [STAR-QAboard] QA Board Meeting 10/29
- Date: Sat, 30 Oct 2021 01:45:35 +0800 (GMT+08:00)
Hi all:
A brief minutes for today's meeting:
Comments:
1). RunID 450 to 500, the jump in eta/phi plot likely due to the RDO problems during this runing period.
2). At the beginning of the run, the beam is not centered, so there is shift in eta;
Things to do:
1). Compare the bad run-list to those points that outside the normal ranges, see if there is plotting issues;
2). Check the RunLog to find out the possible reasons for the bad runs;
3). Check other variables like Q;
4). Change the tolerance from 5sigma to 3sigma, to check the sensitivity of cuts.
Conclusion:
Need to do some checks, but the run list after this QA is good enough for centrality.
2. Discussion:
1). Centrality group is fine with using DCA, but will also monitor the sDCA. May change DCA to sDCA after having a good understanding of this variable.2). Yu Hu will update the code in Github.
3) We are 80% of the way through 14.6 GeV production. 14.6 GeV QA will start ASAP after the data production is done.
4) For FXT run QA, need a few changes eg. need to change RefMult to number of primary tracks, shift vr cuts. Each working group should think about the changes on QA.
Best,
Ting
-
[STAR-QAboard] QA Board Meeting 10/29,
林挺, 10/28/2021
- Re: [STAR-QAboard] QA Board Meeting 10/29, ashik, 10/28/2021
-
Re: [STAR-QAboard] QA Board Meeting 10/29,
Rongrong Ma, 10/29/2021
- Re: [STAR-QAboard] QA Board Meeting 10/29, 林挺, 10/29/2021
- Re: [STAR-QAboard] QA Board Meeting 10/29, 林挺, 10/29/2021
Archive powered by MHonArc 2.6.24.