Skip to Content.
Sympa Menu

star-qaboard-l - Re: [STAR-QAboard] Update to the 14.6 GeV Injection Runs List

star-qaboard-l@lists.bnl.gov

Subject: STAR QA Board

List archive

Chronological Thread  
  • From: Rongrong Ma <marr@bnl.gov>
  • To: Daniel Cebra <cebra@physics.ucdavis.edu>
  • Cc: Kaifeng Shen via STAR-QAboard-l <star-qaboard-l@lists.bnl.gov>
  • Subject: Re: [STAR-QAboard] Update to the 14.6 GeV Injection Runs List
  • Date: Tue, 14 Dec 2021 20:17:09 -0500

Hello Dan

Thanks for sharing this. I have updated the list on the Drupal page: https://drupal.star.bnl.gov/STAR/pwg/common/bes-ii-run-qa/Run19-AuAu-146-GeV-COL-1. I also confirm that there are no duplicates, so 401 injection runs in total. 

I assume you have checked that the duplicates I found for 19.6 GeV are true, not mistyped run numbers?

Best
Rongrong

On Dec 14, 2021, at 1:37 PM, Daniel Cebra <cebra@physics.ucdavis.edu> wrote:

Hi Rongrong and others interested in 14.6 GeV,
   I apologize for this update... I found an injection runs list that was prepared back in 2019 for the 14.6 GeV run. That list identified an additional 21 Injection runs that I had not found by scanning the Log Books (These were poorly documented by the shift crews). I have added these 21 runs to the Injection runs .xlsx file and attached a new version. Please delete all the old versions of this list. (Also as a note, the two duplicate run numbers that I had in my first version, which Rongrong deleted, were cases of me typing the run number in incorrectly, I have now added the correct run numbers in those two cases as well - these were found with the 2019 draft inj. run list. I also note that the 2019 version had many omissions, so this QA independent cross check is a very good idea).

Regards, Daniel

On Sat, Dec 11, 2021 at 6:12 PM Rongrong Ma <marr@bnl.gov> wrote:
Hello Daniel

Thanks. I have added them to the child pages on https://drupal.star.bnl.gov/STAR/pwg/common/bes-ii-run-qa

One thing I noticed is that there are duplicated run numbers in the xlsx file: 
- 19.6 GeV: 20066008, 20067038, 20067047, 20069042, 20071016
- 14.6 GeV: 20111051, 20132001

After removing duplicated runs, I got 274 injection runs for 19.6 GeV and 381 runs for 14.6 GeV. 

Best
Rongrong

On Dec 11, 2021, at 5:24 PM, Daniel Cebra <cebra@physics.ucdavis.edu> wrote:

Hi Rongrong,
   I have attached the Injection runs list for 19.6 and 14.6 GeV.   I have these in .xlsx format. 

Best, Daniel

On Sat, Dec 11, 2021 at 6:27 AM Rongrong Ma <marr@bnl.gov> wrote:
Hello Dan

Could you send me the final injection run list so that I can put it on Drupal? Thanks. 

Best
Rongrong

> On Dec 10, 2021, at 7:50 PM, Daniel Cebra via STAR-QAboard-l <star-qaboard-l@lists.bnl.gov> wrote:
> 
> Hello Folks,
>    As I note earlier today, there are some additions (and one subtraction) needed to the Injections Runs List for 19.6 GeV - Who controls this list - i.e. I want to make sure that we make changes in the "master" list and that these then propagate to others.
> 
>    On another note, we are starting 14.6... Gene, do you already have an injections run list for 14.6 (we ran injection runs for the first two weeks of that run), or should I prepare such a list?
> 
> regards, Daniel
> _______________________________________________
> STAR-QAboard-l mailing list
> STAR-QAboard-l@lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/star-qaboard-l
<19.6 GeV Injection Runs List.xlsx><14.6 GeV Injection Runs List.xlsx>

<14.6 GeV Injection Runs List.xlsx>




Archive powered by MHonArc 2.6.24.

Top of Page