Skip to Content.
Sympa Menu

star-qaboard-l - Re: [STAR-QAboard] QA for Au+Au at 9.2 GeV b and c

star-qaboard-l@lists.bnl.gov

Subject: STAR QA Board

List archive

Chronological Thread  
  • From: Muhammad Abdulhamid <muhammad_ibrahim@aucegypt.edu>
  • To: Ting Lin <tinglin@sdu.edu.cn>
  • Cc: star-qaboard-l@lists.bnl.gov
  • Subject: Re: [STAR-QAboard] QA for Au+Au at 9.2 GeV b and c
  • Date: Sat, 4 Feb 2023 22:13:17 +0200

Dear Dr. Lin,

Thanks for your email. Looking forward to this meeting. 

Sincerely,
Muhammad 


On Sat, 4 Feb 2023, 2:58 am Ting Lin, <tinglin@sdu.edu.cn> wrote:

Dear Muhammad:


No problem, we can meet next Friday at noon BNL time on Feb. 10th to discuss your QA results.


Best,

Ting



-----Original Messages-----
From:"Muhammad Abdulhamid via STAR-QAboard-l" <star-qaboard-l@lists.bnl.gov>
Sent Time:2023-02-04 02:55:09 (Saturday)
To: star-qaboard-l@lists.bnl.gov, marr@bnl.gov
Cc:
Subject: Re: [STAR-QAboard] QA for Au+Au at 9.2 GeV b and c

Dear QA team, Dr. Rongrong,

I hope this email finds you well.

I would like to present the QA results for Au+Au collision at 9.2 GeV (b and c). I hope we have a meeting next Friday if possible.

Sincerely,
Muhammad 

On Mon, 30 Jan 2023, 3:33 am , <star-qaboard-l-request@lists.bnl.gov> wrote:
Send STAR-QAboard-l mailing list submissions to
        star-qaboard-l@lists.bnl.gov

To subscribe or unsubscribe via the World Wide Web, visit
        https://lists.bnl.gov/mailman/listinfo/star-qaboard-l
or, via email, send a message with subject or body 'help' to
        star-qaboard-l-request@lists.bnl.gov

You can reach the person managing the list at
        star-qaboard-l-owner@lists.bnl.gov

When replying, please edit your Subject line so it is more specific
than "Re: Contents of STAR-QAboard-l digest..."


Today's Topics:

   1. Re: QA for production_9p2GeV_2020b and
      production_9p2GeV_2020c (Ma, Rongrong)
   2. Re: QA for production_9p2GeV_2020b and
      production_9p2GeV_2020c (Ma, Rongrong)


----------------------------------------------------------------------

Message: 1
Date: Mon, 30 Jan 2023 01:28:15 +0000
From: "Ma, Rongrong" <marr@bnl.gov>
To: Muhammad Abdulhamid <muhammad_ibrahim@aucegypt.edu>
Cc: "star-qaboard-l@lists.bnl.gov" <star-qaboard-l@lists.bnl.gov>
Subject: Re: [STAR-QAboard] QA for production_9p2GeV_2020b and
        production_9p2GeV_2020c
Message-ID: <B93FE517-B262-41DA-A7DC-1582430EF3D7@bnl.gov>
Content-Type: text/plain; charset="us-ascii"

Hello Muhammad

Yes, I think you are right. 2020c and 2020b are the correct ones for Run20 9.2 GeV data. It will be great if you can perform QA on them. Thanks.

Best
Rongrong

On Jan 29, 2023, at 11:56 AM, Muhammad Abdulhamid <muhammad_ibrahim@aucegypt.edu<mailto:muhammad_ibrahim@aucegypt.edu>> wrote:

Hello Dr. Rongrong,

I hope this email finds you well.

I can also perform QA analysis for "production_9p2GeV_2020b" and "production_9p2GeV_2020c" if there is no one else will do that.

Also, I checked the Production picoDST Summary, but I did not find trigger "production_9p2GeV_2020". I just found b and c.

Best regards,
Muhammad


On Sat, 28 Jan 2023, 11:39 pm Muhammad Abdulhamid, <muhammad_ibrahim@aucegypt.edu<mailto:muhammad_ibrahim@aucegypt.edu>> wrote:
Hello Dr. Rongrong,

Thanks for your email.

Sure, I will do a QA analysis for this data set.

Best regards,
Muhammad

On Sat, 28 Jan 2023, 10:17 pm Ma, Rongrong, <marr@bnl.gov<mailto:marr@bnl.gov>> wrote:
Hello Muhammad

So far, we do not have anyone assigned for 9.2 GeV. If you could help, that will be great. Thanks.

Best
Rongrong

On Jan 28, 2023, at 12:11 PM, Muhammad Abdulhamid via STAR-QAboard-l <star-qaboard-l@lists.bnl.gov<mailto:star-qaboard-l@lists.bnl.gov>> wrote:

Hello,

Apologies for the inconvenience. I did not attend the last meeting. So, I wonder if there is any need for performing a QA analysis for production_9p2GeV_2020 or otherwise. I can if needed.

Best regards,
Muhammad

On Wed, 25 Jan 2023, 7:00 pm , <star-qaboard-l-request@lists.bnl.gov<mailto:star-qaboard-l-request@lists.bnl.gov>> wrote:
Send STAR-QAboard-l mailing list submissions to
        star-qaboard-l@lists.bnl.gov<mailto:star-qaboard-l@lists.bnl.gov>

To subscribe or unsubscribe via the World Wide Web, visit
        https://lists.bnl.gov/mailman/listinfo/star-qaboard-l
or, via email, send a message with subject or body 'help' to
        star-qaboard-l-request@lists.bnl.gov<mailto:star-qaboard-l-request@lists.bnl.gov>

You can reach the person managing the list at
        star-qaboard-l-owner@lists.bnl.gov<mailto:star-qaboard-l-owner@lists.bnl.gov>

When replying, please edit your Subject line so it is more specific
than "Re: Contents of STAR-QAboard-l digest..."


Today's Topics:

   1. Fwd: [Starprod-l] P23ia production_9p2GeV_2020    physics
      production QA     request (Ma, Rongrong)


----------------------------------------------------------------------

Message: 1
Date: Wed, 25 Jan 2023 13:39:25 +0000
From: "Ma, Rongrong" <marr@bnl.gov<mailto:marr@bnl.gov>>
To: "star-qaboard-l@lists.bnl.gov<mailto:star-qaboard-l@lists.bnl.gov>" <star-qaboard-l@lists.bnl.gov<mailto:star-qaboard-l@lists.bnl.gov>>
Subject: [STAR-QAboard] Fwd: [Starprod-l] P23ia production_9p2GeV_2020
        physics production QA   request
Message-ID: <71BBF60C-090F-41C2-A2DC-AC7884BEABBA@bnl.gov<mailto:71BBF60C-090F-41C2-A2DC-AC7884BEABBA@bnl.gov>>
Content-Type: text/plain; charset="us-ascii"



Begin forwarded message:

From: "Van Buren, Gene via Starprod-l" <starprod-l@lists.bnl.gov<mailto:starprod-l@lists.bnl.gov><mailto:starprod-l@lists.bnl.gov<mailto:starprod-l@lists.bnl.gov>>>
Subject: [Starprod-l] P23ia production_9p2GeV_2020 physics production QA request
Date: January 25, 2023 at 2:03:19 AM EST
To: didenko via Starprod-l <starprod-l@lists.bnl.gov<mailto:starprod-l@lists.bnl.gov><mailto:starprod-l@lists.bnl.gov<mailto:starprod-l@lists.bnl.gov>>>
Reply-To: "Van Buren, Gene" <gene@bnl.gov<mailto:gene@bnl.gov><mailto:gene@bnl.gov<mailto:gene@bnl.gov>>>, discussion list for all aspects of STAR's offline data production <starprod-l@lists.bnl.gov<mailto:starprod-l@lists.bnl.gov><mailto:starprod-l@lists.bnl.gov<mailto:starprod-l@lists.bnl.gov>>>

Hello, all

The P23ia physics production of production_9p2GeV_2020, production_9p2GeV_2020b, amd production_9p2GeV_2020c is underway and awaiting QA/feedback from analyzers. A temporary list of a few thousand on-disk picoDsts is available here:

/star/data14/GRID/NFS_FileList/production_9p2GeV_2020bc_physics_P23ia_SL23a.picoDst.txt

Production logs are available here:
/star/rcf/prodlog/P23ia/log/da

Thanks,
-Gene
for the Production Team
_______________________________________________
Starprod-l mailing list
Starprod-l@lists.bnl.gov<mailto:Starprod-l@lists.bnl.gov><mailto:Starprod-l@lists.bnl.gov<mailto:Starprod-l@lists.bnl.gov>>
https://lists.bnl.gov/mailman/listinfo/starprod-l

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://lists.bnl.gov/pipermail/star-qaboard-l/attachments/20230125/14e85dff/attachment-0001.html>

------------------------------

Subject: Digest Footer

_______________________________________________
STAR-QAboard-l mailing list
STAR-QAboard-l@lists.bnl.gov<mailto:STAR-QAboard-l@lists.bnl.gov>
https://lists.bnl.gov/mailman/listinfo/star-qaboard-l


------------------------------

End of STAR-QAboard-l Digest, Vol 30, Issue 2
*********************************************
_______________________________________________
STAR-QAboard-l mailing list
STAR-QAboard-l@lists.bnl.gov<mailto:STAR-QAboard-l@lists.bnl.gov>
https://lists.bnl.gov/mailman/listinfo/star-qaboard-l


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://lists.bnl.gov/pipermail/star-qaboard-l/attachments/20230130/f5c5d0f1/attachment-0001.html>

------------------------------

Message: 2
Date: Mon, 30 Jan 2023 01:32:51 +0000
From: "Ma, Rongrong" <marr@bnl.gov>
To: "Ma, Rongrong" <marr@bnl.gov>
Cc: Muhammad Abdulhamid <muhammad_ibrahim@aucegypt.edu>,
        "star-qaboard-l@lists.bnl.gov" <star-qaboard-l@lists.bnl.gov>
Subject: Re: [STAR-QAboard] QA for production_9p2GeV_2020b and
        production_9p2GeV_2020c
Message-ID: <342113BD-0ADB-4B31-B1A2-7AA291AEBA3D@bnl.gov>
Content-Type: text/plain; charset="us-ascii"

Hello Again

Since this is a small sample, probably "production_9p2GeV_2020" is not produced yet. But it should be produced later on.

Thanks.

Best
Rongrong

On Jan 29, 2023, at 8:28 PM, Ma, Rongrong via STAR-QAboard-l <star-qaboard-l@lists.bnl.gov<mailto:star-qaboard-l@lists.bnl.gov>> wrote:

Hello Muhammad

Yes, I think you are right. 2020c and 2020b are the correct ones for Run20 9.2 GeV data. It will be great if you can perform QA on them. Thanks.

Best
Rongrong

On Jan 29, 2023, at 11:56 AM, Muhammad Abdulhamid <muhammad_ibrahim@aucegypt.edu<mailto:muhammad_ibrahim@aucegypt.edu>> wrote:

Hello Dr. Rongrong,

I hope this email finds you well.

I can also perform QA analysis for "production_9p2GeV_2020b" and "production_9p2GeV_2020c" if there is no one else will do that.

Also, I checked the Production picoDST Summary, but I did not find trigger "production_9p2GeV_2020". I just found b and c.

Best regards,
Muhammad


On Sat, 28 Jan 2023, 11:39 pm Muhammad Abdulhamid, <muhammad_ibrahim@aucegypt.edu<mailto:muhammad_ibrahim@aucegypt.edu>> wrote:
Hello Dr. Rongrong,

Thanks for your email.

Sure, I will do a QA analysis for this data set.

Best regards,
Muhammad

On Sat, 28 Jan 2023, 10:17 pm Ma, Rongrong, <marr@bnl.gov<mailto:marr@bnl.gov>> wrote:
Hello Muhammad

So far, we do not have anyone assigned for 9.2 GeV. If you could help, that will be great. Thanks.

Best
Rongrong

On Jan 28, 2023, at 12:11 PM, Muhammad Abdulhamid via STAR-QAboard-l <star-qaboard-l@lists.bnl.gov<mailto:star-qaboard-l@lists.bnl.gov>> wrote:

Hello,

Apologies for the inconvenience. I did not attend the last meeting. So, I wonder if there is any need for performing a QA analysis for production_9p2GeV_2020 or otherwise. I can if needed.

Best regards,
Muhammad

On Wed, 25 Jan 2023, 7:00 pm , <star-qaboard-l-request@lists.bnl.gov<mailto:star-qaboard-l-request@lists.bnl.gov>> wrote:
Send STAR-QAboard-l mailing list submissions to
        star-qaboard-l@lists.bnl.gov<mailto:star-qaboard-l@lists.bnl.gov>

To subscribe or unsubscribe via the World Wide Web, visit
        https://lists.bnl.gov/mailman/listinfo/star-qaboard-l
or, via email, send a message with subject or body 'help' to
        star-qaboard-l-request@lists.bnl.gov<mailto:star-qaboard-l-request@lists.bnl.gov>

You can reach the person managing the list at
        star-qaboard-l-owner@lists.bnl.gov<mailto:star-qaboard-l-owner@lists.bnl.gov>

When replying, please edit your Subject line so it is more specific
than "Re: Contents of STAR-QAboard-l digest..."


Today's Topics:

   1. Fwd: [Starprod-l] P23ia production_9p2GeV_2020    physics
      production QA     request (Ma, Rongrong)


----------------------------------------------------------------------

Message: 1
Date: Wed, 25 Jan 2023 13:39:25 +0000
From: "Ma, Rongrong" <marr@bnl.gov<mailto:marr@bnl.gov>>
To: "star-qaboard-l@lists.bnl.gov<mailto:star-qaboard-l@lists.bnl.gov>" <star-qaboard-l@lists.bnl.gov<mailto:star-qaboard-l@lists.bnl.gov>>
Subject: [STAR-QAboard] Fwd: [Starprod-l] P23ia production_9p2GeV_2020
        physics production QA   request
Message-ID: <71BBF60C-090F-41C2-A2DC-AC7884BEABBA@bnl.gov<mailto:71BBF60C-090F-41C2-A2DC-AC7884BEABBA@bnl.gov>>
Content-Type: text/plain; charset="us-ascii"



Begin forwarded message:

From: "Van Buren, Gene via Starprod-l" <starprod-l@lists.bnl.gov<mailto:starprod-l@lists.bnl.gov><mailto:starprod-l@lists.bnl.gov<mailto:starprod-l@lists.bnl.gov>>>
Subject: [Starprod-l] P23ia production_9p2GeV_2020 physics production QA request
Date: January 25, 2023 at 2:03:19 AM EST
To: didenko via Starprod-l <starprod-l@lists.bnl.gov<mailto:starprod-l@lists.bnl.gov><mailto:starprod-l@lists.bnl.gov<mailto:starprod-l@lists.bnl.gov>>>
Reply-To: "Van Buren, Gene" <gene@bnl.gov<mailto:gene@bnl.gov><mailto:gene@bnl.gov<mailto:gene@bnl.gov>>>, discussion list for all aspects of STAR's offline data production <starprod-l@lists.bnl.gov<mailto:starprod-l@lists.bnl.gov><mailto:starprod-l@lists.bnl.gov<mailto:starprod-l@lists.bnl.gov>>>

Hello, all

The P23ia physics production of production_9p2GeV_2020, production_9p2GeV_2020b, amd production_9p2GeV_2020c is underway and awaiting QA/feedback from analyzers. A temporary list of a few thousand on-disk picoDsts is available here:

/star/data14/GRID/NFS_FileList/production_9p2GeV_2020bc_physics_P23ia_SL23a.picoDst.txt

Production logs are available here:
/star/rcf/prodlog/P23ia/log/da

Thanks,
-Gene
for the Production Team
_______________________________________________
Starprod-l mailing list
Starprod-l@lists.bnl.gov<mailto:Starprod-l@lists.bnl.gov><mailto:Starprod-l@lists.bnl.gov<mailto:Starprod-l@lists.bnl.gov>>
https://lists.bnl.gov/mailman/listinfo/starprod-l

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://lists.bnl.gov/pipermail/star-qaboard-l/attachments/20230125/14e85dff/attachment-0001.html>

------------------------------

Subject: Digest Footer

_______________________________________________
STAR-QAboard-l mailing list
STAR-QAboard-l@lists.bnl.gov<mailto:STAR-QAboard-l@lists.bnl.gov>
https://lists.bnl.gov/mailman/listinfo/star-qaboard-l


------------------------------

End of STAR-QAboard-l Digest, Vol 30, Issue 2
*********************************************
_______________________________________________
STAR-QAboard-l mailing list
STAR-QAboard-l@lists.bnl.gov<mailto:STAR-QAboard-l@lists.bnl.gov>
https://lists.bnl.gov/mailman/listinfo/star-qaboard-l


_______________________________________________
STAR-QAboard-l mailing list
STAR-QAboard-l@lists.bnl.gov<mailto:STAR-QAboard-l@lists.bnl.gov>
https://lists.bnl.gov/mailman/listinfo/star-qaboard-l

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://lists.bnl.gov/pipermail/star-qaboard-l/attachments/20230130/72a62296/attachment.html>

------------------------------

Subject: Digest Footer

_______________________________________________
STAR-QAboard-l mailing list
STAR-QAboard-l@lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-qaboard-l


------------------------------

End of STAR-QAboard-l Digest, Vol 30, Issue 5
*********************************************



Archive powered by MHonArc 2.6.24.

Top of Page