Skip to Content.
Sympa Menu

star-tpc-l - [Star-tpc-l] TPC Meeting Minutes

star-tpc-l AT lists.bnl.gov

Subject: Star-tpc-l mailing list

List archive

Chronological Thread  
  • From: Richard Witt <witt AT usna.edu>
  • To: Star-tpc L <Star-tpc-l AT lists.bnl.gov>
  • Subject: [Star-tpc-l] TPC Meeting Minutes
  • Date: Wed, 26 Oct 2022 13:34:45 -0400

Present: Flemming, Alexei, Tonko, Yuri, Tommy, Mike, Gene, and myself

== Hardware
— continuing to clean holes for survey
— building 3D sensor for TPC displacement measurement
— no measurement possible until March or April due to construction

== Electronics
— see slide from Tonko (sent to TPC list)
— expectation is everything will be done, including debugging and verifying, by March, 2023
— includes rewrite of FPGA firmware, rewrite of DAQ framework, and new cluster finder
— note that verification of TPX will require tracking (deconvoluting stage)
— should be done within next 2 weeks 
— cannot spend time on discrepancies in embedding right now, will be revisited later
— hardware should be done earlier, by end of January
— current hardware work (RDO repair, etc.) is proceeding slowly
— requests will be made regarding how to adjust the scheduling

== Software
— Yuri and Tommy investigating embedding
— checks have been done for Runs 18 and 19
— software commits have been made
— some issue with backward compatibility
— one line of code should fix
— similar problem to be addressed in Run 17
— work on dE/dx model continues
— Irakli continuing alignment work for Run 21

== AOB
— nothing new reported this week

Sent from my iPad
-- 
"Education is the most powerful weapon which you can use to change
the world."

--Nelson Mandela

~~~***~~~***~~~***~~~***~~~***~~~***~~~***~~~***~~~***~~~***~~~***~
 Richard Witt, Professor of Physics     Phone (USNA): 410-293-6675
    United States Naval Academy         Email: witt AT usna.edu
~~~***~~~***~~~***~~~***~~~***~~~***~~~***~~~***~~~***~~~***~~~***~



Archive powered by MHonArc 2.6.24.

Top of Page