TPC meeting March 16,2023
Present: Gene, Tommy, Yuri, Alexei, Jim and Flemming
-Hardware
Alexei complete East laser alignment; Laser system is now ready for upcoming run
Next week will install ‘new’ magnetic sensors for additional monitoring.
Q: can these be interfaced to Slow Control (Monitoring)
- Electronics
- The TPX s8-3 RDO issue turned out to be a network card problem in the DAQ PC. West is ok a few FEEs are masked off for run
- East TPC should also be ready.
Gating grid tests
- Gene is proposing that we test the effectiveness (transparency) of the GG under different beam conditions.
- Aim to take short runs (<1 min) with 2,3,4,5kHz rate for MB data taking and similar for High lumi running later in the runs.
- Gene will talk to Jeff on setting up run configs so it can easily be run by crew. And with JG on beam conditions.
- The equest will be added to the TPC reafiness status
Pre run calibrations
Had long discussion on FF/RFF information that should be extracted. STAR magnet is currently wired for FF.
Yuri would like, now that Alexei has installed detector to monitor possible movement , that we switch a couple of times between FF , 0 , and RFF to see if a) there is a movement and b) if it is reproduceable. This does not need COSMIC data
It was not clear how this knowledge would translate into improved calibrations of TPC. Jim pointed out that (some) E-B mis alignment is already included in space charge distortions (static?). Gene commented that the main geometry calibration issue/uncertainties is related to the super sector to super sector alignment.
Yuri iterated that understanding if there are movements of TPC between FF and RFF will help for calibrations methods.
WWill bring the proposal up at readiness for TPC, but expect to get push back to the ‘cost’ (time, people,..) of doing multiple filed switches.
De/dx calibrations
Yuri pointed to the presentation at last S&C meetins that identified at FF/RFF difference between a correction that has been used previous for de/dx vs. position along wire attributed to wire to pad plane diff. See https://drupal.star.bnl.gov/STAR/system/files/RunXXI%20OO200GeV.pdf
FV raised the issue why this shows up in OO at 200 GeV which has about equal positive and negative charge tracks with opposite curvatures.
+ Run 21 dAu200 SpaceCharge
- Babu continues to find essentially no asymmetry between east and west, despite historically seeing ~20% more in east
- Gene sees asymmetry in the lower luminosity Run 21 dAu data, but it disappears at high luminosity
- Recommendation from Gene was for Babu to process more high luminosity data to help investigate dependencies further
- Run 22 pp500 SpaceCharge
- Babu has plenty of SpaceCharge work to do even without Run 22, plus his physics analysis
- Gene has asked the PWGs to provide an additional helper to investigate possible fill-by-vill variations as seen in Run 17
- Good to educate more people about SpaceCharge anyhow, even if Babu does find time to work on it
+ New cluster finder
- Tonko expects it to be not just different, but "better"
- Tommy proposed a test with embedding to see if momentum resolution and acceptance improves as Tonko hopes
- Yuri suggests not to focus on momentum resolution, but rather efficiency
- Tommy will discuss with Tonko more
+ dE/dx adjustments by analyzers
- Tommy brought up artificial, empirical dE/dx nsigma shifting by analyzers for BES-I datasets
- Yuri says that's ok as a band-aid for older productions of iTPC era data, but that the new dE/dx model introduced last year should help avoid this
- Tommy is willing to work on a standard version of the empirical band-aid for people to use, and no one objected
--
Flemming Videbaek
senior scientist, emeritus
videbaek @ bnl.gov
Brookhaven National Lab
Physics Department
Bldg 510D
Upton, NY 11973
phone: 631-344-4106
cell : 631-681-1596
- [Star-tpc-l] minutes from March 16, 2023, videbaek, 03/16/2023
Archive powered by MHonArc 2.6.24.