TPC meeting June 13, 2024
Present: Yuri, Alexei, Gene, Jim, Flemmig, Tommy, Dan
Hardware:
Worked on magnetometer interface. The RS232 does not seem to work, had help from David, Tim. We agree to have shift crew record setting once per hour. Now instituted. Stability seems to be in order .1 %% much better than current reading. Alexei will pursue options for readout to slow control.
Laser:
Laser in general are not great. Weak laser (eats or west?) crew not tuning well while taking data.
Electronics:
Kind of steady: loosing maybe 1 RDO per day; being brought back from tonko when time available (ie no beam)
Software:
Pp500 run 22 data proceeding. Now on pass 2. Mostly looks good and improved, but a few fills semms not to have converged in pass 2. Will reapet, but continue to pass 3 with the starting with pass 2 results. The beamline calibration also need to be repeated with the pass 2 calib.
Yuri has a new alignment (super sectors) 2024 and applied it to the all of the run 19-21 FXT data that showed a large CM track breaking as found by the Davis group. It seems to have fixed that problem see https://www.star.bnl.gov/~fisyak/star/Tpc/Alignment/FXT_CM_Tracks_splitting/
This is very encouraging. Yuri will continue with look at t0 adjustments, and once that done like to make a TFG production of about 100M events on 11.5 GeV data (020) to check results, in particular K0s mass dependence on phi-eta .
--
Flemming Videbaek
senior scientist, emeritus
videbaek @ bnl.gov
Brookhaven National Lab
Physics Department
Bldg 510D
Upton, NY 11973
phone: 631-344-4106
cell : 631-681-1596
- [Star-tpc-l] minutes TPC meeting 6/13/2924, videbaek, 06/14/2024
Archive powered by MHonArc 2.6.24.