Skip to Content.
Sympa Menu

star-tpc-l - [Star-tpc-l] tpc meeting minutes 6/27/224

star-tpc-l AT lists.bnl.gov

Subject: Star-tpc-l mailing list

List archive

Chronological Thread  
  • From: videbaek <videbaek AT bnl.gov>
  • To: Star-tpc L <Star-tpc-l AT lists.bnl.gov>
  • Subject: [Star-tpc-l] tpc meeting minutes 6/27/224
  • Date: Thu, 27 Jun 2024 18:06:20 -0400


TPC meeting June 27, 2024
Present: Alexei, Jim, Frank, Dan, Yuri, Mattheu, Gene and Flemming

-hardware:
Position and composition of NMR probe has been documented by Alexei. An entry to drupal blog has been added https://drupal.star.bnl.gov/STAR/blog/videbaks/NMR-probes.
This would require an update to detector description in GEANT as it is in the active are of BBC and EPD.

Tim has order additional interface so the NMR readout can be attached to slow control.

Shift crews as usually struggles to operate laser well. Alexei provides on hand training to crew, and this helps a lot.

-software
Yuri presented at the Tuesday mgt meeting status, and a detailed plan for alignment and calibration needed for the FXT target data and beyond, The plan was well received by mgt and will form basis for work in the coming month , including calibrations tasks for BTOF, eTOF,… The presentation is available at https://drupal.star.bnl.gov/STAR/event/2024/06/25/STAR-management-meeting/TPC-Alignment2024

-electronics
Usual loss of ~1 RDO per day of running. Several have been brought back to life by Tonko when there is sufficient downtime available to diagnose issues (prom’s power distribution).
Fairly stable overall.

- QA team identified data where offline cluster finding failed to read adc files causing memory overwrites and leaks. Issue was identified by Tonko, and relates only to offline cluster finding. Pull request has been generated.

-software
Yuri is working on optimizing t0 for FXT to minimize residual track breaking, using position of target (200 – 200.5 cm).

Richard T. and Jae N. is working with Gene on 2022 space charge. Fill-by-fill correction is proceeding well.






--
Flemming Videbaek
senior scientist, emeritus
videbaek @ bnl.gov
Brookhaven National Lab
Physics Department
Bldg 510D
Upton, NY 11973

phone: 631-344-4106
cell : 631-681-1596



  • [Star-tpc-l] tpc meeting minutes 6/27/224, videbaek, 06/27/2024

Archive powered by MHonArc 2.6.24.

Top of Page