Present: Alexei, Gene, Jim, Yuri, Mathias, Pavel, Daniel, Frank, and myself
== Hardware
— installed magnetometer on July 6th
— data stream goes to dB
— readings look good
— magnet has been half-field for past couple days due to humidity
— gas system is also okay
— some ongoing network problems as well and a failed switch
— maybe run with 3/4 field to reduce trips?
— possible but will reduce momentum resolution
— also, we have no official field map for 3/4 field (though we only have a map for 1/2 field, FF only)
— also, not likely analysis groups will utilize the set
== Electronics
— problems with PROMS
— increasing current in some FEEs and parent RDOs not working properly
— perhaps due to chips suffering radiation damage(?)
— more problems on iTPC (inner) sectors than on TPX (outer) sectors
— two RDOs lost last night, may not be recoverable
== Software
— Run 22 SC
— calibration is proceeding
— third pass starting end of this week
— studying second pass right now
— will have a beam line calibration as well for third pass
— expect about 3 weeks, should be ready for TPC dE/dx sample in early August
— Progress on FXT final data production
— see slides at https://drupal.star.bnl.gov/STAR/system/files/TPCFXT2024.pdf
— TPC alignment nearly finalized
— Prepared TFG24c release
— Adjust trigger delay based on PV reconstruction comparison with 2 different methods
— use either hits or tracks from West or East TPC only (see slide 3)
— in preparing TFG24c, need to split repo due to number of files reaching cvmfs upper limit
— no access to file needed for splitting
— instructions for using TFG24c are on slide 7 of this presentation
— use of production cluster was refused for producing calibration samples
— using TFG allocated space on RCF to run smaller batches to start FXT test production
— will take about 3 weeks at current rate
— began preparation of TFG release for merger with official STAR (star-sw) repo
— need to separate alignments between old and new on merger so as not to introduce confusion
— Mathias will begin looking at produced files as they appear
— More resources are needed to finish in 2 weeks, 100 TB and more CPU (about a factor 5 increase)
— need a STAR management statement on these requirements
== AOB
— Nothing else new reported this week.
Best Regards,
Richard
Sent from my iPad
--
"Education is the most powerful weapon which you can use to change
the world."
--Nelson Mandela
~~~***~~~***~~~***~~~***~~~***~~~***~~~***~~~***~~~***~~~***~~~***~
Richard Witt, Professor of Physics Phone (USNA): 410-293-6675
United States Naval Academy Email: witt AT usna.edu
~~~***~~~***~~~***~~~***~~~***~~~***~~~***~~~***~~~***~~~***~~~***~
"Education is the most powerful weapon which you can use to change
the world."
--Nelson Mandela
~~~***~~~***~~~***~~~***~~~***~~~***~~~***~~~***~~~***~~~***~~~***~
Richard Witt, Professor of Physics Phone (USNA): 410-293-6675