Hi Yuri,
Thanks for finding the issue quickly, so you can proceed.
best F
On 2024-09-13 11:54, Fisyak, Yuri V wrote:
Hi Flemming and All, it looks like that I made a “FALSE ALARM”. I
am sorry.
Without Data Base double peak structure has disappeared.
See https://www.star.bnl.gov/~fisyak/star/Tpc/Alignment/T0/ [1]
At DEV2_newDB7, disable starTrigDelay correction from Data base
I will redo tuning starTrigDelay.
Yuri
Fisyak
STAR Phone: +1 631 344 3913
Brookhaven National Laboratory Fax: +1 631 344 4206
510A/1-161
http://www.star.bnl.gov/~fisyak E-mail: fisyak AT bnl.gov
From: Fisyak, Yuri V <fisyak AT bnl.gov>
Date: Thursday, September 12, 2024 at 6:13 PM
To: Videbaek, Flemming <videbaek AT bnl.gov>, Star-tpc L
<Star-tpc-l AT lists.bnl.gov>
Subject: Re: [[Star-tpc-l] ] timing shifts
Hi Flemming,
For dAu200_2021 it was two interruptions with
26p5GeV_fixedTarget_2021.
There is a possibility that dAu200_2021 takes parameters from
26p5GeV_fixedTarget_2021.
I am checking this right now by removing any adjustments for trigger
time delay from DB.
Date Time
{"dAu200_2021",
20210630, 22849, "y2019", "dAu200_2021" },
{"26p5GeV_fixedTarget_2021e", 20210703, 10650, "y2019",
"26p5GeV_fixedTarget_2021" },
{"dAu200_2021b", 20210703,
53033, "y2019", "dAu200_2021" },
{"26p5GeV_fixedTarget_2021f", 20210703, 230657,
"y2019", "26p5GeV_fixedTarget_2021" },
{"dAu200_2021c", 20210704,
34046, "y2019", "dAu200_2021" },
Yuri
Fisyak
STAR Phone: +1 631 344 3913
Brookhaven National Laboratory Fax: +1 631 344 4206
510A/1-161
http://www.star.bnl.gov/~fisyak E-mail: fisyak AT bnl.gov
From: star-tpc-l-request AT lists.bnl.gov
<star-tpc-l-request AT lists.bnl.gov> on behalf of videbaek
<videbaek AT bnl.gov>
Date: Thursday, September 12, 2024 at 6:05 PM
To: Star-tpc L <Star-tpc-l AT lists.bnl.gov>
Subject: re: [[Star-tpc-l] ] timing shifts
Hi Yuri,
I looked briefly at the conditions that the dAu was run between day
183
and 184.
As I can tell there is no recorded change in trigger setup. i.e. the
tier-1 file has same name
and thus according to convention has same parameters. So I think it is
unlikely that the external trigger timing has changed.
Is it possible that there is a calibration parameters that has been
used
in reconstruction is changing because there was a FXT target run
in-between day 183 and 184? just asking
Depending on your answer we could contact JH and Akio.
best Flemming
--
Flemming Videbaek
senior scientist, emeritus
videbaek @ bnl.gov
Brookhaven National Lab
Physics Department
Bldg 510D
Upton, NY 11973
phone: 631-344-4106
cell : 631-681-1596
Links:
------
[1] https://www.star.bnl.gov/~fisyak/star/Tpc/Alignment/T0/
--
Flemming Videbaek
senior scientist, emeritus
videbaek @ bnl.gov
Brookhaven National Lab
Physics Department
Bldg 510D
Upton, NY 11973
phone: 631-344-4106
cell : 631-681-1596
-
re: [[Star-tpc-l] ] timing shifts,
videbaek, 09/12/2024
-
Re: [[Star-tpc-l] ] timing shifts,
Fisyak, Yuri V, 09/12/2024
-
Re: [[Star-tpc-l] ] timing shifts,
Van Buren, Gene, 09/12/2024
-
Re: [[Star-tpc-l] ] timing shifts,
James Dunlop, 09/13/2024
-
Re: [[Star-tpc-l] ] timing shifts,
Fisyak, Yuri V, 09/13/2024
- Re: [[Star-tpc-l] ] timing shifts, James Dunlop, 09/13/2024
-
Re: [[Star-tpc-l] ] timing shifts,
Fisyak, Yuri V, 09/13/2024
-
Re: [[Star-tpc-l] ] timing shifts,
James Dunlop, 09/13/2024
-
Re: [[Star-tpc-l] ] timing shifts,
Fisyak, Yuri V, 09/13/2024
- Re: [[Star-tpc-l] ] timing shifts, videbaek, 09/13/2024
-
Re: [[Star-tpc-l] ] timing shifts,
Van Buren, Gene, 09/12/2024
-
Re: [[Star-tpc-l] ] timing shifts,
Fisyak, Yuri V, 09/12/2024
Archive powered by MHonArc 2.6.24.