TPC meeting April 3, 2024
Present: Alexei, Jim, Gene, Flemming Yuri
Excused: Richard

Hardware:
Taking cosmics in FF configuration. To prepare for shutdown, and fix magnet issues. Continue to take data until Thursday at 8 pm. Alexei with start N2 flowing and be present until mixture is below 7% and the blue sheet can be signed. Was completed at ~2 am.
A/C in gas room. One unit repaired, one more to go. Needed for summer operation
A?C in hall not working.
Magnet will be switched back to RFF for CAD crew to make sure it is ready for running.
Electronics:
Noise still shows up in sector 3 and 4. Usually fixed by taking pedestal Tonko promised at 10 o’clock meeting to look more into this in coming week. Some observations
a) Shows up in all time bins (in charge step plots. Also peak at mid value.
b) Some up in all pads integrated over a run.
c) Does not show up in all events
d) Shows up in adcs and clusters.
Software:
Yuri looked at some of the FF data. Sees that delta(r-phi) change from matching to GMT, in order shy of 2 mm.
Jim/Gene points out twist effect (mis-alignment of E vs B axis) is not included. Yuri says it has been absorbed in alignment since 2012.
Gene says space charge corrections for all BES-II collisions system in progress, and includes also auau run 24 data.

--
Flemming Videbaek
senior scientist, emeritus
videbaek @ bnl.gov
Brookhaven National Lab
Physics Department
Bldg 510D
Upton, NY 11973

phone: 631-344-4106
cell : 631-681-1596


  • [[Star-tpc-l] ] minutes April 3, videbaek, 04/05/2025

Archive powered by MHonArc 2.6.24.

Top of Page