star-tpc-l AT lists.bnl.gov
Subject: Star-tpc-l mailing list
List archive
- From: videbaek <videbaek AT bnl.gov>
- To: Star-tpc L <Star-tpc-l AT lists.bnl.gov>
- Subject: [[Star-tpc-l] ] minutes tpc meeting
- Date: Thu, 02 Oct 2025 14:56:06 -0400
TPC meeting 10/02/2025
present: Jim, Gene, Yuri, Alexei and Flemming. Richard excuses due to gov shutdown.
Brief initial discussion on status of break in datataking due to faulty yellow abort kicker, and vacuum problem. Beam may be back Sunday late.
Hardware.
TPC took cosmic at ½ Forward field. Total of 30 hours.
Laser good, Gas good. Some issue with Drift velocity at zero filed. Yuri is looking into this.
Electronics. No real issue during last week with cosmics.
Software
Yuri has look at all cosmic from this year and summarized results see. https://drupal.star.bnl.gov/STAR/system/files/RF_FF_RHF_FHF.pdf
The resolution at 1 GeV/c for pair tracks has dropped for ½ field to about 6.6%
The momentum resolution drops from Full to Half magnetic
Fileds by a factor of ~3 due to :
• Reduction of of
field by a factor
2, and• Degradation of
TPC space
resolution by a
factor ~2
AOB
Only data to be calibrated (for TPC) is 1/2F and Full field data.
--
Flemming Videbaek
senior scientist, emeritus
videbaek @ bnl.gov
Brookhaven National Lab
Physics Department
Bldg 510D
Upton, NY 11973
phone: 631-344-4106
cell : 631-681-1596
- [[Star-tpc-l] ] minutes tpc meeting, videbaek, 10/02/2025
Archive powered by MHonArc 2.6.24.