Skip to Content.
Sympa Menu

usatlas-hllhc-l2deputymgmt-nsf-l - Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] BOE Tables, Cost Books and Drilldown Reports

usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov

Subject: U.S. ATLAS HL-LHC Upgrade Level 2 and Deputies-NSF only Management Mailing List

List archive

Chronological Thread  
  • From: Gustaaf Brooijmans <gusbroo AT nevis.columbia.edu>
  • To: John Parsons <parsons AT nevis.columbia.edu>, "Freedman, Rhoumela" <rfreedman AT bnl.gov>, "'usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov'" <usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
  • Subject: Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] BOE Tables, Cost Books and Drilldown Reports
  • Date: Thu, 11 Jul 2019 21:07:42 -0400


Look closer ;-)

On 7/11/19 8:46 PM, John Parsons wrote:

Are we still supposed to have an "Estimating Method"
pie chart in the BOEs?  If so, have updated versions
(eg. without including preMREFC) been produced, and
where can we find them?  I don't see them among the
docs below.

Thanks,
    John

On 6/28/19 2:11 PM, Freedman, Rhoumela wrote:
Hi everyone,

The BOE Tables, Cost Books and Drilldown Reports have been posted up on DocDB.  Here are the respective DocDB Numbers for each system:

  * 6.4 – LAr – 840
  * 6.5 – Tile – 841
  * 6.6 – Muon – 842
  * 6.8 – Trigger – 843

Please let me know if you have any questions.

Thank you,

Rhoumela

Rhoumela Freedman, Administrator

U.S. ATLAS HL-LHC Upgrade Project

Brookhaven National Laboratory, Physics Dept.

Tel: (631) 344-3460

Fax: (631) 344-6179

rfreedman AT bnl.gov <mailto:rfreedman AT bnl.gov>


_______________________________________________
Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l



--
Gustaaf Brooijmans - Columbia University
@Columbia: (212) 854 4527; Nevis virtual phone: (914) 591 2804

Als sie mich holten,
gab es keinen mehr, der protestieren konnte.




Archive powered by MHonArc 2.6.24.

Top of Page