  • From: Gustaaf Brooijmans <gusbroo AT nevis.columbia.edu>
  • To: usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
  • Subject: Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Couldn't find two tasks in the schedule
  • Date: Wed, 28 Aug 2019 16:07:38 +0200


Hi Elliot,

We do not post excel schedules for reviews. But you can do a search on a pdf as well.

Best,

Gustaaf

On 8/28/19 4:01 PM, Elliot Lipeles wrote:

Hi Mike,

Good catch, they've apparently been renumbered since the scrubbing report file I was using.

They should be GEPPSA6335, GEPPSA6405 both on page 37 of the pdf schedule.

Is it correct that there is no excel version of the schedule for the FDR documentation? I've been using scrubbing reports because drilldown reports don't have milestones.

Excel is nice because I can just filter on "algorithm emulation" and get the list of tasks.

Elliot


On Wed, Aug 28, 2019 at 9:41 AM Michael Tuts <tuts AT pmtuts.net <mailto:tuts AT pmtuts.net>> wrote:

Hi Elliot,____

In looking at your answer to ____

__ __

3. PDR recommendation for trigger was: Validate Global Trigger
Firmware performance with a bit-wise validated emulator running on
data and simulation and make the emulator and this validation a
deliverable. Was this completed?____

/Answer: Tasks to do this validation have been included in the WBS
for the Global Trigger Firmware algorithm task lists. Specifically
the tasks to write and update the emulation are: //GEPAF2600/

<https://atlas-hllhc.docdb.bnl.gov/0002/000294/008/WBS%206.08%20Trigger%20Detailed%20Schedule%2020190812.pdf#page=28>/,
//GEPAF2710/

<https://atlas-hllhc.docdb.bnl.gov/0002/000294/008/WBS%206.08%20Trigger%20Detailed%20Schedule%2020190812.pdf#page=28>/,
//GEPAF3430/

<https://atlas-hllhc.docdb.bnl.gov/0002/000294/008/WBS%206.08%20Trigger%20Detailed%20Schedule%2020190812.pdf#page=31>/,
//GEPAF3530/

<https://atlas-hllhc.docdb.bnl.gov/0002/000294/008/WBS%206.08%20Trigger%20Detailed%20Schedule%2020190812.pdf#page=31>/,
//GEPJF4440/

<https://atlas-hllhc.docdb.bnl.gov/0002/000294/008/WBS%206.08%20Trigger%20Detailed%20Schedule%2020190812.pdf#page=33>/,
//GEPJF4450/

<https://atlas-hllhc.docdb.bnl.gov/0002/000294/008/WBS%206.08%20Trigger%20Detailed%20Schedule%2020190812.pdf#page=33>/,
//GPHER5400/

<https://atlas-hllhc.docdb.bnl.gov/0002/000294/008/WBS%206.08%20Trigger%20Detailed%20Schedule%2020190812.pdf#page=35>/,
//GPHER5410/

<https://atlas-hllhc.docdb.bnl.gov/0002/000294/008/WBS%206.08%20Trigger%20Detailed%20Schedule%2020190812.pdf#page=35>/,
GEPPSA6240, GEPPSA6250, //GEPTIA7300/

<https://atlas-hllhc.docdb.bnl.gov/0002/000294/008/WBS%206.08%20Trigger%20Detailed%20Schedule%2020190812.pdf#page=39>/,
and //GEPTIA7310/

<https://atlas-hllhc.docdb.bnl.gov/0002/000294/008/WBS%206.08%20Trigger%20Detailed%20Schedule%2020190812.pdf#page=39>/./____

I could not find the tasks GEPPSA6240, GEPPSA6250 in the schedule
that is linked to the review website

https://atlas-hllhc.docdb.bnl.gov/0002/000294/008/WBS%206.08%20Trigger%20Detailed%20Schedule%2020190812.pdf
. For the others I linked to the specific pages in the schedule
(since it is a 41 page pdf document, it is probably helpful to point
reviewers to the specific location in the schedule)____

__ __

Cheers, Mike____




_______________________________________________
Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l





Archive powered by MHonArc 2.6.24.

Top of Page