usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
Subject: U.S. ATLAS HL-LHC Upgrade Level 2 and Deputies-NSF only Management Mailing List
List archive
[Usatlas-hllhc-l2deputymgmt-nsf-l] NSF annual report contributions due Sept 15 at the ; latest
- From: Michael Tuts <tuts AT pmtuts.net>
- To: "usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov" <usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
- Subject: [Usatlas-hllhc-l2deputymgmt-nsf-l] NSF annual report contributions due Sept 15 at the ; latest
- Date: Thu, 10 Sep 2020 18:21:10 +0000
Hi NSF L2 managers, Just a reminder that we would like to get the input for the annual report from you by Sept 15 or earlier.
The nature of this annual report (guidelines were sent in the original message) is perhaos different from other examples, but some asked about Phase I/Operations reports so I asked John Hobbs for links to those.
Thanks, Mike From: John Hobbs The most recent ops annual report is on Google drive at https://drive.google.com/open?id=1kP9ezZXFxtvo3Kv4WA5uPtayQSsvv_Mk and if it's useful, the year 4 Phase I upgrade report is at https://drive.google.com/open?id=1ewWY80KjNvB0b66vI5c_Dl8JO3oiJrjV
|
- [Usatlas-hllhc-l2deputymgmt-nsf-l] NSF annual report contributions due Sept 15 at the ; latest, Michael Tuts, 09/10/2020
Archive powered by MHonArc 2.6.24.