Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] draft closeout report for fact check
- From: Gustaaf Brooijmans <gusbroo AT nevis.columbia.edu>
- To: usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
- Subject: Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] draft closeout report for fact check
- Date: Wed, 16 Jun 2021 16:22:47 +0200
The fewer comments the better....
On 6/16/21 4:21 PM, David W Miller wrote:
Hi Mike,
I have looked at it and for Tile looks OK.
TILE Cal: TILE Cal technical progress generally looks very good.
There have been significant schedule delays since the FDR.
Risk-adjusted L2 completion dates and associated float to the
need-by dates should be presented at the August review.
It would have been nice of them to note that despite the delays, there is *still* significant float (nearly 1 year of working time). Not sure if that’s worth an addendum, though.
Cheers,
David
On Jun 16, 2021, at 9:00 AM, Michael Tuts <tuts AT pmtuts.net <mailto:tuts AT pmtuts.net>> wrote:
Hi All,
Just got this, sending it on immediately for fact checking. Please respond in any case so I know you have looked at it.
Thanks, Mike
-----Original Message-----
From: Edward Blucher <blucher AT hep.uchicago.edu <mailto:blucher AT hep.uchicago.edu>>
Sent: Wednesday, June 16, 2021 9:59 AM
To: Michael Tuts <tuts AT pmtuts.net <mailto:tuts AT pmtuts.net>>
Cc: Denisov, Dmitri <denisovd AT bnl.gov <mailto:denisovd AT bnl.gov>>; Lavelle, Cathleen B <lavellec AT bnl.gov <mailto:lavellec AT bnl.gov>>; taylorl AT fnal.gov <mailto:taylorl AT fnal.gov>; John Carlstrom <jc AT kicp.uchicago.edu <mailto:jc AT kicp.uchicago.edu>>; Paul L. Tipton <paul.tipton AT yale.edu <mailto:paul.tipton AT yale.edu>>; Tulika Bose <tulika AT hep.wisc.edu <mailto:tulika AT hep.wisc.edu>>; Ted Liu (thliu AT fnal.gov <mailto:thliu AT fnal.gov>) <thliu AT fnal.gov <mailto:thliu AT fnal.gov>>
Subject: draft closeout report for fact check
Dear Mike,
Here is our draft closeout report. If you can, please take a quick look to let us know if there are any factual errors we should correct. If we hear back from you early enough, we can move the closeout up to 11 AM. Otherwise, we'll stick with 11:15.
Thanks.
Ed
<ATLAS MREFC Director's Review 2021.pdf>_______________________________________________
Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov <mailto:Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l
_______________________________________________
Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l
--
Gustaaf Brooijmans - Columbia University
@Columbia: (212) 854 4527; Nevis virtual phone: (914) 591 2804
Als sie mich holten,
gab es keinen mehr, der protestieren konnte.
-
[Usatlas-hllhc-l2deputymgmt-nsf-l] FW: draft closeout report for fact check,
Michael Tuts, 06/16/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] FW: draft closeout report for fact check,
Gustaaf Brooijmans, 06/16/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] FW: draft closeout report for fact check,
Thomas Schwarz, 06/16/2021
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] FW: draft closeout report for fact check, Michael Tuts, 06/16/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] FW: draft closeout report for fact check,
Gustaaf Brooijmans, 06/16/2021
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] FW: draft closeout report for fact check, Stephanie Majewski, 06/16/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] FW: draft closeout report for fact check,
Thomas Schwarz, 06/16/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] draft closeout report for fact check,
David W Miller, 06/16/2021
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] draft closeout report for fact check, Gustaaf Brooijmans, 06/16/2021
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] FW: draft closeout report for fact check, Evans, Harold G., 06/16/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] FW: draft closeout report for fact check,
John Parsons, 06/16/2021
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] FW: draft closeout report for fact check, Thomas Schwarz, 06/16/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] FW: draft closeout report for fact check,
Gustaaf Brooijmans, 06/16/2021